
Transport - 40
SK350 Operator’s Manual
Haul
CMW
Unload
1.
Prepare trailer and ramps for unloading.
2.
Remove tiedowns.
3.
Disengage parking brake.
4.
Start engine.
5.
Pull lift arm control to raise mount plate (and attachment) off ground, but keep it low.
6.
Adjust throttle to low speed and slowly back unit down trailer or ramps.
Unhitch Trailer
1.
Stop tow vehicle and trailer on level ground.
2.
Put manual transmission into first or reverse gear or automatic transmission into park. Turn off ignition.
Set parking brake.
3.
Block trailer wheels.
4.
Reverse “Hitch Trailer” steps on page 37 to unhitch trailer from tow vehicle.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Attach trailer to vehicle before loading or unloading.
NOTICE: If unloading from tilt-bed trailer, be prepared for trailer to tilt.
Summary of Contents for Ditch Witch SK350
Page 1: ...SK350 Operator s Manual Issue 3 1 Original Instruction CMW...
Page 9: ...Contents 8 SK300 Operator s Manual CMW...
Page 19: ...Safety 18 SK350 Operator s Manual Emergency Procedures CMW...
Page 49: ...Service 48 SK350 Operator s Manual Overview CMW Overview...
Page 71: ...Specifications 70 SK350 Operator s Manual Basic Unit CMW...
Page 74: ......
Page 75: ......
Page 76: ...SK350 Operator s Manual Service Record 75 CMW Service Record Service Performed Date Hours...
Page 77: ...CMW Service Record 76 SK350 Operator s Manual Service Performed Date Hours...