background image

1

 select a program number (PRgM-02~20) you want to change the details 

  with the <uP/DOwn> button

2

 if you touch the <uP> + <EnTER> button simultaneously, the <program no.-RP01> 

  you want is displayed on the Text window and the light is on the <sETTing> text.

3

 when you Touch the <uP/DOwn> button, the screen is changed to 

  <program no.-RP01>, <program no.-HD01>, <program no.-RP02>, 
  <program no.-HD02>, <program no.-RP03>, and <program no.-HD03> in turn.

4

 when you touch the <EnTER> button process variables (temperature, holding time, 

  heater power %) are flickering

5

 After adjusting the values using the <uP/DOwn> button, touch the <EnTER> button to save 

6

 Touching the <CLEAR> button returns the screen to the initial stage anytime.

< Adjustable variables for each detailed process >

 Heating step (RP01, PR02, RP03 ) : Target temperature(0~220

), heater power %(0~100%)

 Holding step ( HD01, HD02, HD03 ) : Holding time(0~300seconds), heater power%(0~100%)

 ※ 

You can discharge the beans anytime during the roasting by touching the <EjECT> button, or pulling the <manual discharge valve> 

 

at the back if the bean is not discharged with the <EjECT> button.

  

Text window Temperature 

display

Functional 

display

Button 

Operation status

Remarks

selecting 

PRgM 01 

 

 

  

uP/DOwn 

selecting program

start 

CLEAn /

 

 

 

 

sTART 

Heater and Fan

At the first operation after the power connection or 

every third operation, the device will sound chaff 

tray cleaning alarm (CLEAn). Then clean the tray and 

reinstall to release the alarm and switch to the PREHEAT 

(preheating)

01-PRHT 

Operation

Preheating 

01-PRHT 

 

 

  

The drum rotates for 10 seconds 

per minute.

The drum repeats 50s stop and 10s rotation.

Coffee green 

bean input

AD BEAn 

165

 

  

Drum rotation

300~800cc of Coffee green bean input 

using the hopper, and release alarm when the 

temperature reaches to 120

1st heating

01-RP01 

150

 

  

 

 

 

1st holding

01-HD01 

150

 

 

 

 

not displayed for 0-second

2nd heating

01-RP02 

183

 

 

 

 

 

 

2nd holding

01-HD02 

183

℃ 

 

 

 

Maintain for 60 seconds

3rd heating

01-RP03 

190

 

 

 

 

 

 

3rd holding

01-HD03 

190

℃ 

 

 

 

Maintain for 30 seconds

Discharging

EjECT 

  

  

Heater off / Open the outlet

 

 

Cooling

COOLing 

  

 

 

Close the outlet/

Open the outlet, and close the outlet 

after 30 seconds

Drum rotation off

Finish

01-EnD 

  

  

Fan off

Finish after 5 minutes cooling

Discharging and cooling

roasting (PrGM-01~20)

Detailed program change (PrGM-02~20)

when the <EjECT> is displayed on the <Text window> along with an alarm sound, roasted beans are discharged into the tray, and the 
<COOLing> is displayed when the Eject (Discharging) is completed, followed by cooling process.  in order to keep roasting at this time, touch 
the <CLEAR> button to stop cooling, replace the mesh container, and then touch the <sTART> button again.

* For faster cooling, you may take out the mesh container after the discharging and during the cooling process, and cool the mesh container 
  using a fan.
* For strong roasting with large volume, shake the mesh container after discharging to spread the beans evenly. Otherwise, some beans sunken  
  in the middle may not cooled and hinder the uniformity.

CRF-800

smart Ceramic Coffee Roaster user Manual

CRF-800

smart Ceramic Coffee Roaster user Manual

Process variables can be 

adjusted with the EnTER button

Adjust the variable 

with the uP/DOwn button

save with 

the EnTER button

Exit with 

the CLEAR button

selecting program

(PRgM-02~20) 

selecting detailed process with uP/DOwn button

uP+EnTER

1

 

Touch the <uP/DOwn> button to select the program you want (PRgM-02~20).

2

 

Touch the <EnTER>button (The <Roasting strength adjusting indicator> is flickering)

3

 

Touch the <uP/DOwn>button to select roasting strength (Lighter / Darker).

4

 

Touch the <EnTER> button to save.

(One gradation represents 5 seconds)

Simple roasting strength change

selecting

program

Enter

Enter

uP or DOwn

selecting program

sTART

(CLEAn : chaff tray cleaning)

Coffee green bean input

Finish

Preheat

Add bean

8

9

Summary of Contents for CRF-800

Page 1: ...sapre used product butratherthatitresultedfromadirectroastingtestbythemanufacturerusingcoffeegreenbeans beforeconsignmentforperformanceandfunctionalitytests 4 Thisdevicecannotbeusedwithothercurrentorvoltagespecificationsdifferentfromtheonespecifiedinthe usermanualwhichwassuppliedtogetherorfoundonthebackofthedevice CRF 800 SmartCeramicCoffeeRoasterUserManual CMTECHCO LTD Head office Factory 37 Maey...

Page 2: ... Program copy 7P eject discharge and cooling 7P Simple roasting strength change 8P Detailed program change 8P Roasting 9P Programming using PRGM FS 10P Programming using PRGM CS 11P Drum cleaning and replacement 12P CondensationTray Cleaning 13P Fan Cleaning 14P Error code status and measures 15P A S Regulations 15P Product specifications 16P Productwarranty 16p Contents CRF 800 Smart Ceramic Coff...

Page 3: ...diluant et alcool il peut provoquer une explosion un incendie ou une détérioration 3 ne pas tremper la machine dans l eau pour un nettoyage Ne pas utiliser la machine dans l évier le bain ou un endroit humide il peut provoquer une panne lorsque la machine est mouillée 4 ne pas utiliser la machine lorsqu elle est dans un état anormal il peut provoquer un incendie ou une décharge électrique 5 n util...

Page 4: ...ue la machine ne décharge pas après avoir appuyé sur le bouton retirer le plateau de coquille et faire tourner le tambour avec tournevis Lors que le déchargeoir n est pas ouvert tirer la valve d évacuation en arrière de la machine et tourner le tambour pour décharger les grains contacter le service après vente pour un contrôle une révision et une réparation 1 Do not use it in an overly heated plac...

Page 5: ...to turn on the Control panel Roasting strength adjusting indicator Time display Temperature display Text window Button Functional display Selecting program Hopper Bean entrance hole cover Viewport Control panel Power switch Vent pipe Chaff tray Manual discharging valve Power code Mesh container Cooling chamber Before inserting coffee green beans pick up foreign substances and chips less than 3mm d...

Page 6: ...1 HD01 150 Not displayed for 0 second 2nd heating 01 RP02 183 2nd holding 01 HD02 183 Maintain for 60 seconds 3rd heating 01 RP03 190 3rd holding 01 HD03 190 Maintain for 30 seconds Discharging EJECT Heater off Open the outlet Cooling COOLING Close the outlet Open the outlet and close the outlet after 30 seconds Drum rotation off Finish 01 END Fan off Finish after 5 minutes cooling Dischargingandc...

Page 7: ...nitoringwhileitisbeingused Neglectingmayleadtoburnoffthebeanorcauseafire Whentheroastingreachesthestatusyouwant youcantouchthe EJECT buttonanytimeduringtheroastingtodischargeandforyourownprogramming Youalwaysneedtotouchthe ENTER buttonforthe1stcrackduringRP02andfor2ndcrackduringRP03 Otherwise itisprogressedaccordingtothebuilt inconditions Ifyoudon twanttosavetheprogram youcantouchthe CLEAR buttona...

Page 8: ...ng bolts Remove the inner glass window Takeoutthedrum 12 Makesurethedeviceisfullycooledbeforecleaningandreplacement Drumcleaningandreplacement Cleaning Ifnecessary CRF 800 Smart Ceramic Coffee Roaster User Manual 13 1 Open cooling chamber Condensation tray 2 Take the tray out 3 Push the tray to the end 3 Clean the tray with wet cloth or water 4 Insert the tray to the guide rail after fully drying ...

Page 9: ... ER Error on drum rotation 1 Inspect if the drum is properly mounted 2 Rotation sensor inspection and replacement 3 Motor inspection and replacement 4 Coupling bolts inspection and tightening TIME ER Error when each process time exceeds 30 minutes Heater inspection and replacement COMM ER Communication error between main PCB and LCD board Communication inspection and replacement VOLT ER When the i...

Page 10: ...n Max 0 8kw per cycle 8 Green coffee bean input 300 800cc about 200 700g Product name Electric heating kitchen appliance coffee roaster Model name CRF 800 Manufacture s serial no Purchase date 20 Customer name Phone No Address The warranty period of this product is one year after the purchase date refer to A S regulations For repair this warranty has to be presented Make sure to keep this warranty...

Reviews: