background image

Page 16

Step 11.

Mark the three holes on the centerline. Re

m

ove your

VC and place to the side. Drill the three holes using
1/2” ce

m

ent drill bit at least 1 inch deep.

Step 12.

Tap in the three lag shields supplied. Place the VC
back in place aligning the three holes secure with
three 5/16” lag bolts plus washers supplied.

Step 13.

Your VC is now secure to wall. You can adjust your VC
closer or farther fro

m

 the wall to avoid s

m

all obstruc-

tions. The closer your VC is to the wall the 

m

ore sta-

ble it will be. Adjust your VC if necessary. Deter

m

ine if

the base needs to be secured to the floor for extra sta-
bility. Cli

m

b on your VC to see if the base 

m

oves. If

you want to secure to the floor, continue to next step.

Step 8.

Mounting your VC to ce

m

ent wall. Mark a line hori-

zontally 85 inches fro

m

 the floor.

Step 9.

Attached the brack-
et to you VC using
the four bolts,
washers and nuts
supplied, centering
the four bolts to
allow adjust

m

ent

forward and back-
wards.

Step 10.

Stand your VC up and rest the bracket against the
wall. Place the holes of the bracket on the center line
you have 

m

arked on the wall. The front base holes on

the VC should be approxi

m

ately 38 inches fro

m

 the

wall. This distance 

m

ay vary depending on the wall,

base boards, and or where the bracket is positioned.

THE CENTERLINE

2”x 6” Board

85 inches from
the ground is 
the centerline

Keep spacing at least 40” apart.

Bolts centered in brackets.

NOTE:

Before mounting to wall, make sure brackets are centered
to allow forward and backward adjustment from wall.

THE CENTERLINE

NOTE:

For multiple units side by side, spacing should be a minimum of
40” from the center of the vertical center line of each unit.

40”

Summary of Contents for VERSA CLIMBER

Page 1: ...CM OPERATIONAL MANUAL MADE IN USA...

Page 2: ......

Page 3: ...CTING A LANDMARK 6 USING HYDRAULICS TO CONTROL SPEED 7 VERSACLIMBER SPECIFICATIONS 8 UNPACKING INSTRUCTIONS 8 ASSEMBLY INSTRUCTIONS 9 12 ASSEMBLY INSTRUCTIONS FOR HIGH TRI HIGH FIVE 12 MAINTENANCE INS...

Page 4: ......

Page 5: ...Page 3...

Page 6: ......

Page 7: ...VHOHFWHG VWHS KHLJKW WLPH UDWH DQG GLVWDQFH PLFURFRPSXWHU PRQLWRUV DQG GLVSOD V FOLPELQJ SHUIRUPDQFH KHDUW UDWH FDORULHV GLVWDQFH WLPH DQG JLYHV DXGLEOH LQVWUXFWLRQV DQG PRWLYDWLRQDO PHVVDJHV GXULQJ W...

Page 8: ...36 3 1 56 1 7 80 6 21 7 2 0 3 1 2 7 1 5 6 25 58 5 5 36 2 7 1 6 2 127 5 63 25 7 1 1 3257 21 2 7 1 21 7 1 6 2 7 029 1 1 5 36 2 127 2 2172 7 9 57 3267 48 67 57 3XVK 48 67 57 RQ WKH PRGXOH DQG IROORZ YHU...

Page 9: ...RZV WR UDLVH RU ORZHU RXU ZHLJKW LQ WKH GLVSOD XQWLO LW PDWFKHV RXU ZHLJKW ZLWKLQ SOXV RU PLQXV ILYH SRXQGV RU WZR NLOR JUDPV 7KHQ SUHVV WKH 2 6 7 21 EXWWRQ WR HQWHU RXU ZHLJKW LQWR WKH FRPSXWHU 17 5...

Page 10: ...The hydraulic control knob is located DW WKH ERWWRP RI WKH FRQWURO FRQVROH Clockwise rotation of the control knob to the right slows the rate of motion easier CounterclockwiVe rotation of the control...

Page 11: ...orie burn rate 0 2000 Display Units Imperial and Metric Audio Volume Control Power Transformer 110 Volt AC TOOLS REQUIRED FOR ASSEMBLY OF A SINGLE UNIT One 3KLOOLSV VFUHZGULYHU Two 9 16 wrenches Two a...

Page 12: ...oss support see photo below Avoid lifting the machine by or setting the machine on any potion of the black plastic housing or plastic oil accumulator Attach the front curved tubular floor brace to the...

Page 13: ...O NOT TIGHTEN FULLY AT THIS TIME Attach tubular brace between post and back tubular floor base with 2 3 8 lock nuts DO NOT TIGHTEN FULLY After tubular brace is in place go back and FULLY TIGHTEN the t...

Page 14: ...J SHGDO VKDIW HYHU HDUV Securely TIGHTEN foot pedals ZLWK ZUHQFK Attach side handrails with 3 hex head bolts 41 4 long and 3 3 8 lock nuts Join left and right hand rails Loosely attach two 3 8 lock nu...

Page 15: ...with 4 hex head bolts 3 8 x 11 4 long and 4 3 8 lock nuts Do not fully tighten Attach second VersaClimber to the circular plate in a similar fashion Do not fully tighten nuts Lift assembly of two Vers...

Page 16: ...illed with oil that does not require changing When climbing oil passes through the pressure control valve Closing the valve increases climb ing resistance and opening the valve decreases climbing resi...

Page 17: ...e to at least 2 studs with wood screws or drywall screws at least 3 long Step 5 Stand your VC up and rest the bracket against the piece of wood mounted to the wall Place the holes of the bracket on th...

Page 18: ...VC to cement wall Mark a line hori zontally 85 inches from the floor Step 9 Attachedthebrack et to you VC using the four bolts washers and nuts supplied centering the four bolts to allow adjustment fo...

Page 19: ...VC to cement wall Mark a line hori zontally 85 inches from the floor Step 9 Attachedthebrack et to you VC using the four bolts washers and nuts supplied centering the four bolts to allow adjustment fo...

Page 20: ...L ZEROS ARE REGISTERING ON MODULE If all zeros register on the display when the machine is in motion there could be a faulty encoder circuit board broken or loose wire connectors With the top black pl...

Page 21: ...unction in the needle valve Tighten the nut on the needle valve if it is loose If leak persists the valve must be replaced Do not remove the defective valve until you receive the new one Detailed inst...

Page 22: ...15000 Tach Bracket 015 13 000 Top Cover Speaker CM 015 10 000 Power Supply UK CM 60070 Moving Parts Foot Pedal Assembly 101 04 000 Foot Pedal Straps 008 03 000 Foot Pedal Connector Plastic Triangle 0...

Page 23: ...s expressly agreed that NO WARRANTY OF MER CHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE or of a particular use nor any warranty of any kind what soever express implied or statutory is made by H R...

Page 24: ...dy whether based on tort or otherwise and H R I shall not be liable for any injuries to persons or property In no event shall H R I be liable for incidental or consequential damages for commercial los...

Reviews: