2.INSTALLATION
2.1 UNPACKING
Carefully
remove
the
cardboard outer shell by cutting the retaining straps then removing
the top and then the side panels.
Inspect the machine carefully for any hidden shipping damage. Notify the shipping
company right away if any damage is observed.
Remove the machine from the wooden skid. This can be done by two people on the
smaller table top machines. However an approved fork lift will be required for the larger
SC and DC models.
Important note
: Refer to the Moving the Machine Section below.
Wipe down the outside of the machine.
2.2 MOVING THE MACHINE
Promax chamber style vacuum packaging machines are available in three basic designs, TC
(Table Top), SC (Free Standing Single Chamber) and DC (Double Chamber). Recommendations
for the movement of all three types are listed below.
TC Machines
: Some of the smallest TC units may be lifted off of their wooden skid and moved
manually. However Promax recommends that moving even the smallest of their TC units
should not be attempted by one person. The larger TC units should be lifted with the aid of a
fork lift or other approved lifting aid. Prior to lifting with a forklift the forks should be adjusted to
a width that provides the machine with stable support. The proper lifting point for TC machines is
to place the
forks so they come in contact with the units rubber feet located on the bottom of the
machine.
SC Machines
: All SC units should be lifted from their wooden skid and moved to the location
where they will be used with an approved fork lift. Be sure to take note of the points listed below.
DC Machines
: All DC units should be lifted from their wooden skid and moved to the location
where they will be used with an approved fork lift. Be sure to take note of the points listed below.
* Make sure the fork lift forks are properly adjusted for width and use fork extensions if needed.
* Make sure to ascertain the center of gravity and use identified lifting points.
Summary of Contents for Promax SC-800
Page 18: ...16...
Page 22: ...20 5 3 PNEUMATIC DIAGRAM...
Page 23: ...21 5 4 ELECTRICAL DIAGRAM...
Page 25: ...6 1 BODY 23 SC80100000 Body Diagram...
Page 27: ...6 2 1 WORKING BED LR 25 Cushion Bar Set Working Bed Diagram Top...
Page 28: ...6 2 1 WORKING BED LR 26 Working Bed Diagram Bottom...
Page 31: ...6 2 2 WORKING BED FB 29 Cushion Bar Set Working Bed Diagram Top...
Page 32: ...6 2 2 WORKING BED FB 30 Working Bed Diagram Bottom...
Page 35: ...6 3 1 LID DIAGRAM LR 33 SC80300A00 Lid Diagram...
Page 37: ...6 3 2 LID DIAGRAM FB 35 SC80310000 Lid Diagram...
Page 39: ...6 4 SEALING BAR STANDARD DIAGRAM 37 SC80320A00 Sealing Bar Standard Diagram...
Page 41: ...6 4 SEALING BAR STANDARD DIAGRAM 39 SC80374A00 Sealing Bar Standard Diagram...
Page 43: ...6 5 ELECTRICAL BOX 41...