28
WSAT-XSC3 260.6-480.8
M08T40D16-02
6.19 2014/68/UE PED directive
DIRECTIVE 2014/68/UE PED gives instructions for installers, users and maintenance technicians as well.
Refer to local regulations; briefly and as an xample, see the following:
Compulsory verific tion of the first install tion:
•
only for units assembled on the installer’s building site (for ex. Condensing c direct expansion unit)
Certific tion of setting in service:
•
for all the units
Periodical verific tions:
•
to be executed with the frequency indicated by the Manufacturer (see the “maintenance inspections” paragraph)
Summary of Contents for WSAT-XSC3 260.6-480.8
Page 46: ...46 WSAT XSC3 260 6 480 8 M08T40D16 02 8 16 Compressor replacement ...
Page 47: ...M08T40D16 02 WSAT XSC3 260 6 480 8 47 8 17 Exchanger replacement 8 18 Pump replacement ...
Page 49: ...M08T40D16 02 WSAT XSC3 260 6 480 8 49 ...
Page 50: ...50 WSAT XSC3 260 6 480 8 M08T40D16 02 ...
Page 75: ...Page intentionally left blank M08T40D16 02 WSAT XSC3 260 6 480 8 75 ...