
28 CSNX-XHE2
12.2-44.4
M07X40A16-00
9 Maintenance
9.1 General
description
Maintenance must be done by authorized centres or by qualified personnel.
The maintenance allows to:
t
maintain the unit efficiency
t
increase the life span of the equipment
t
assemble information and data to understand the state of the unit efficiency and avoid possible damages
Before checking, please verify the following:
t
the electrical power supply line should be isolated at the beginning
t
the unit isolator is open, locked and equipped with the suitable warning
t
make sure no tension is present
After turning off the power, wait at least 5 minutes before accessing to the electrical panel or any other electrical component.
Before accessing check with a multimeter that there are no residual stresses.
9.2 Inspections
frequency
Perform an inspection every 6 months minimum.
The frequency, however, depends on the use.
In the event of frequent use it is recommended to plan inspections at shorter intervals:
t
frequent use (continuous or very intermittent use, near the operating limits, etc)
t
critical use (service necessary)
√
intervention frequency (months)
1
6
12
1
presence corrosion
X
2
panel fixing
X
3
fan fixing
X
4
coil cleaning
X
5
bowl cl sanitisation
X
6
outflow test
X
7
air filters cleaning / inspection
X
8
check of the fixing and the insulation of the power lead
X
9
check of the earthing cable
X
10
electric panel cleaning
X
11
capacity contactor status
X
12
termina closing, cable insulation integrity
X
13
voltage and phase unbalancing (no load and on-load)
X
14
absorptions of the single electrical loads
X
15
test of the compressor crankcase heaters
X
16
Checking for leaks
*
17
survey of the refrigerant circuit operating parameters
X
18
safety valve
*
19
protective device test: pressure switches, thermostats, flow switches etc..
X
20
control system test: setpoint, climatic compensations, capacity stepping, water / air flow-rate variations
X
21
control device test: alarm signalling, thermometers, probes, pressure gauges etc..
X
* Refer to the local regulations; and ensure correct adherance. Companies and technicians that effect interventions of installation, maintenance/re-
pairs, leak control and recovery must be CERTIFIED as expected by the local regulations. The leak control must be effected with annual renewal.