background image

 

        

 
 
 

The undersigned manufacturer: 

 

SAINT - GOBAIN ABRASIVES S.A. 

190, BD J.F. KENNEDY 

L- 4930 BASCHARAGE 

 
 

Declares that this product: 

Masonry Saws:

 

Jumbo 651 P5.5 Honda   

 

Code:

 

70184610073 

 
 

is in conformity with the following Directives: 

  European Machinery Directive 2006/42/EC 

  Electromagnetic  Compatibility Directive 2004/108/EC 

and European standard: 

  EN 12418 – Masonry and stone cutting-off machines – Safety 

 

                                                                    

 

Pierre Mersch 

Business Manager Machines Europe 

 

 
 
 

Declaration of conformity 

Summary of Contents for NORTON JUMBO 651 HONDA

Page 1: ...JUMBO 651 HONDA OPERATING INSTRUCTIONS...

Page 2: ...2...

Page 3: ...aws Jumbo 651 P5 5 Honda Code 70184610073 is in conformity with the following Directives European Machinery Directive 2006 42 EC Electromagnetic Compatibility Directive 2004 108 EC and European standa...

Page 4: ...4...

Page 5: ...and commissioning 11 3 1 Tool assembly 11 3 2 Starting the machine 11 3 3 Water cooling system 12 4 Transport and storing 13 4 1 Securing for transport 13 4 2 Transport procedure 13 4 3 Long period o...

Page 6: ...the user Observing the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols I...

Page 7: ...Only fit NORTON diamond blades to the machine The use of other tools can damage the machine Read the blades specifications carefully to choose the correct tool for your application Attention is drawn...

Page 8: ...nce for onsite wet and dry cutting operations of a wide range of masonry refractory and natural stone products As with all other NORTON products the operator will immediately appreciate the attention...

Page 9: ...off while fully protecting the blade when in operation Down feed and cutting depth adjustment 4 The spring loaded cutting head activated by hand with the grip on the blade guard ensures smooth loweri...

Page 10: ...ervice classification SG SF SG SF designated on the oil container SAE 10W 30 recommended Max blade diameter 650 mm Bore 25 4 mm Cutting length mm 500 mm Cutting depth mm 265 mm Table dimension 600x500...

Page 11: ...of blade guard Loosen the hexagonal nut on the blade shaft which holds the removable outer flange Remove the outer flange Clean the flanges and blade shaft and inspect for wear Mount the blade on arb...

Page 12: ...he throttle control lever fully to the right then turn the engine switch to the OFF position Turn the fuel valve to the OFF position 3 3 Water cooling system Fill the water pan with clean water to app...

Page 13: ...e eye screw on the conveyor cart 4 2 Transport procedure The machine can be moved on a flat surface using its wheels Only use the lift brackets to lift the machine as other parts of the machine are no...

Page 14: ...nveyor cart Always keep your hands away from the moving blade 5 2 1 Jam or fixed cutting In jam or fixed cutting the cutting head is locked in a fixed position and the material is pushed into it as sh...

Page 15: ...centre of the blade before starting the reverse movement of the conveyor cart NOTE the harder the material the more rapid should be the forward and backward strokes Step cutting lessens the area of th...

Page 16: ...Tighten up Maintenance of the engine Always perform the maintenance of the motor with the machine switched off Adjustment and replacement of the belts To adjust the belts firstly remove the belt guar...

Page 17: ...ry Every 2 years Engine oil To change the oil Remove the oil filler cap dipstick and drain bolt Allow the oil to drain completely Reinstall the drain bolt and tighten it to 18 N m Fill the crankcase w...

Page 18: ...t Never brush the dirt off brushing will force dirt into the fibres Foam element clean in warm soapy water rinse and allow to dry thoroughly Dip the element in clean engine oil and squeeze out all the...

Page 19: ...er then tighten with a plug wrench an additional turn if a new plug to compress the sealing washer If you are reusing a plug tighten 1 8 1 4 turn after the plug seats Fuel line To service the fuel lin...

Page 20: ...ulley is driven by the belts Change the pump 7 3 Customer service When ordering spare parts please mention The serial number 7 digits The code of the part The exact denomination The number of parts re...

Page 21: ...int Gobain Abrasivi S p A Via per Cesano Boscone 4 I 20094 CORSICO MILANO Tel 0039 02 44 851 Fax 0039 024 51 01 238 e mail Norton edilizia saint gobain com Poland Saint Gobain Diamond Products Sp zO O...

Page 22: ...22...

Page 23: ...23...

Page 24: ...24 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 10 11 2008...

Reviews: