![background image](http://html.mh-extra.com/html/climinox/circulair/circulair_technical-notice_2625158010.webp)
Note
Climinox
published on 10/01/2017
(this document can be modified without notice)
If the air conditioner is at a height, use stable scaffolding provided with guard rails.
Maintenance
Note
Climinox
published on 10/01/2017
(this document can be modified without notice)
10
/ 11
The personnel authorised to intervene on the air conditioner must
have been informed of the safety rules to be complied with and the
prescriptions stipulated in this notice.
Cleaning
Before starting cleaning, the operator must ensure that the installation has been
stopped and secured at the electrical control switchboard.
In order to have full access to the MCL to facilitate cleaning, after removing the drain
tube, pivot the pan on the two most curved hooks, then unhook the condensate pan.
CirculAir evaporators are designed to be washed with a high-pressure hose.
However, never direct the stream directly on the fan.