
®
www.climacoolcorp.com
2
Inspection
Upon receipt of equipment, carefully check the shipment
against the bill of lading and inspect each chiller for any
damage incurred during shipment . Thoroughly check for
any visible damage of control panels and electrical
and/or refrigeration components or broken copper lines .
The carrier must make proper notation of any damages or
shortages on all copies of the bill of lading and complete
a common carrier inspection report prior to your final
acceptance of the shipment .
Note:
It is the responsibility
of the purchaser to file all necessary claims with the
carrier . In addition, please notify the ClimaCool Customer
Service Department at 405 .815 .3000 or customerservice@
climacoolcorp .com of all damage immediately .
Storage
Chillers should be stored in an upright position and kept in a
clean, dry area .
Handling of Modules
Carefully remove the module’s packaging . The chiller’s
steel base cutouts provide maneuverability by forklift or
pallet jack into its final position (See Rigging and Lifting
Procedures on page 5) . Verify that all header grooved
couplings and mounting hardware kits are on site prior to
connecting the modules .
Note:
Consult factory for handling
other than in the upright position .
Rigging and Lifting
Each module should be lifted using a pallet jack or fork
lift . If it is necessary to utilize a crane for rigging or lifting,
each module shall be lifted using lifting straps and spreader
bars using rigging points identified on Rigging and Lifting
Procedures on page 5 .
Warranty
To ensure proper equipment longevity, design performance
and reliability, all ClimaCool chillers must be installed,
operated and maintained in accordance with ClimaCool
IO&M manuals . Water quality is of the utmost importance
for the proper care and maintenance of your modular
chiller system . Regular treatment of the water will increase
longevity of your system .
Failure to provide adequate
filtration or treatment of evaporator and condenser
water will void the ClimaCool module’s warranty.
A
factory authorized technician is required to perform
the startup of your ClimaCool chiller . Please contact the
ClimaCool Customer Service Department at 405-815-3000
or
technicalsupport@climacoolcorp .com to schedule .
There is
a
minimum
of three (3) weeks notice required to schedule
your factory startup.
Pre-Installation
Summary of Contents for UCH 30
Page 16: ... www climacoolcorp com 14 Voltage Phase Monitor Wiring ...
Page 21: ...19 www climacoolcorp com Figure 23 Part Load Performance Advantage ...
Page 57: ...55 www climacoolcorp com Wiring Diagrams 030 050 070 Cooling Only ...
Page 58: ... www climacoolcorp com 56 Wiring Diagrams 030 050 070 Cooling Only ...
Page 59: ...57 www climacoolcorp com Wiring Diagrams 030 050 070 Heat Pump ...
Page 60: ... www climacoolcorp com 58 Wiring Diagrams 030 050 070 Heat Pump ...
Page 61: ...59 www climacoolcorp com Wiring Diagrams 085 Cooling Only ...
Page 62: ... www climacoolcorp com 60 Wiring Diagrams 085 Cooling Only ...
Page 63: ...61 www climacoolcorp com Wiring Diagrams 085 Heat Pump ...
Page 64: ... www climacoolcorp com 62 Wiring Diagrams 085 Heat Pump ...
Page 65: ...63 www climacoolcorp com Wiring Diagrams Master Panel ...
Page 66: ... www climacoolcorp com 64 Wiring Diagrams Master Panel ...
Page 70: ... www climacoolcorp com 68 Notes ...