1942362
V1.0
9 April 2020
Clevertest and Clevertest Plus
Refer to the supplementary operation guide supplied with the Product.
After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red
flashing for a period up to 2 minutes.
Zoneworks, HIVE and DATA Monitored Options
Fittings with part numbers -ZW
, -HV, -DATA
are fitted with Zoneworks communications modules (nodes).
These fittings are monitored using either Powerline Carrier Technology that utilize the power cable to
provide data communication, RF transceiver modules operating in the ISM band or a dedicated data cable
to/from data routers installed on a dedicated data trunk connected to a central Server (can also be
connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor, coordinate
testing and collate test data from each fitting. Zoneworks Fittings can be commissioned by a single push
of the test switch or by scanning the supplied barcode. The LED Test Switch indicator provides a
multifunction indication of the status of the fitting during testing and normal operation:
Option
State
LED Operation
ZW, HV, DATA
Commissioned
LED on Solid (Green)
ZW, DATA
Un-commissioned
Batt plugged-in:
yellow 1s, green 1s
Batt unplugged:
red 1s, off 1s
HV
Un-commissioned
With network connectivity
Batt plugged-in:
yellow 1s, green 1s
Batt unplugged:
red 1s, off 1s
HV
Un-commissioned
Without network connectivity
Batt plugged-in:
yellow 250mS, green
250mS, yellow 250mS, green 250mS,
green 1s
Batt unplugged:
red 250mS, off
250mS, red 250mS,off 250mS, off 1s
ZW, DATA
Emergency Light Test In Progress
LED flashes at yellow 5s , 0ff 1s
HV
Emergency Light Test In Progress
LED flashes at yellow 1s , 0ff 1s
In the case of the DATA version a 2-way “figure 8” cable and terminal block facilitates the connection to
the DATA network via a multi-drop bus (daisy chain connection). For further information of installation of
a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA
version)
DALI EM Option
Fittings with part numbers CWP2LIFE-PRO-WPPOD
-DALI
are fitted with DALI modules (nodes) that
facilitate connection and integration to 3
rd
Party Lighting Control Systems. Before installing the
CWP2LIFE-PRO-WPPOD-DALI please confirm that the Lighting Control System has the capability to
monitor DALI Emergency Fittings. The CWP2LIFE-PRO-WPPOD-DALI will be addressed and configured
into the control system by the Lighting Control System Commissioning Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-commissioned LED on Solid (Green)
Emergency Light Test in progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Fitting goes into emergency mode for 10 seconds
A 2-way “figure 8” cable and terminal block facilitates the connection to the DALI network OR a 5/6way
“structured wiring system” lead and plug facilitating the power and DALI connection. DALI connections
are marked as Da Da.
CWP2LIFE-PRO-WPPOD
Surface Mount Twin Head Emergency
Installation & Maintenance Instruction Leaflet
Victoria (Head Office & Manufacturing)
Website:
Email:
Phone:
+61 3 9559 2700
Fax:
+61 3 9559 2799
New South Wales
Phone:
+61 2 8805 6400
Fax:
+61 2 8805 6444
Queensland
Phone:
+61 7 3442 9700
Fax:
+61 7 3442 9777
South Australia/Northern Territory
Phone:
+61 8 8301 8800
Fax:
+61 8 8351 8286
Western Australia
Phone:
+61 8 9248 3720
Fax:
+61 8 9248 3725
New Zealand
Phone:
+64 800 548 448
Designed in Australia to comply with the requirements
of AS2293.3:2005 and AS/NZS CISPR15: 2011
NOTE: Standard product codes with this symbol are
enabled with Clevertest Plus capability. Please refer to the
operation guide supplied with the product for details.
Models: CWP2LIFE-PRO-WPPOD-xx
Testing:
Manual Test
xx = Blank
Zoneworks
xx = ZW
Z/W DATA
xx = DATA
DALI
xx = DALI
HIVE
xx = HV
Clevertest
xx = CT
(NOTE: -CT Products supplied with the Clevertest Plus Symbol are activated
with Clevertest PLUS capability. Please refer to the operation guide supplied with the
product for details).
Spare Parts:
1550050
Battery, 3.2 Volt 3.2Ah Li-ion
2750356
LP/L10 WP POD, Gen2, 2 LED, Wht LED, Sub Assy
AUM02370050001 CLIFE-PRO-CKIT-NP, Lifelight Pro, Control Only, 530mm, NP, CTP, OWC
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before
installation, ensure that the electricity supply has been switched off and isolated. Installation must be
carried out in accordance with the relevant Australian and International Standards.