background image

1942362 

V1.0   

9 April 2020 

 

Images and Dimensions:

 

   

 

 

 

 

 

 

 

 

 

 

 

Initial Testing:

 

 

When the CWP2LIFE-PRO-WPPOD unit is connected to the un-switched active, it must be allowed to 

charge the battery for at least 24 hours. The emergency lamp only illuminates during a power failure. 

Conduct the following tests: 

 

 

During the first commissioning test the emergency lamp must illuminate for at least 2 hours after 

disconnection from the main supply. The results of all tests are required to be recorded in a service 

logbook, which is to be kept on-site at all times. If the unit fails to illuminate for the requisite time, 

remedial action must be taken to repair the situation and once completed, the unit must pass a 

subsequent test.   

 

Press and hold Test Button in each POD or switch Off Mains Supply, check that the emergency lamp 

is On. 

 

Release the Test Button or Switch on Mains Supply, check that the emergency lamp is Off 

(Non-maintained operation). 

 

Subsequent tests require the unit to illuminate for at least 90 minutes. The results of all tests are 

required to be recorded in a service logbook, which is to be kept on-site at all times. If the unit fails to 

remain illuminated for the requisite time, remedial action must be taken to repair the situation and 

once completed, the unit must pass a subsequent test. For more specific information, please refer to 

the current edition of the AS 2293.3 Standard. 

 

Below are a list of common problems and their possible causes: 

 

Fault:    The Green LED indicator is not illuminated.

 

Check:    A.C. is connected and is turned on. 

 

Battery is connected. 

Test Switch for damage. 

 

Fault:    Lamp does not illuminate in emergency mode. 

 

Check:    A.C. is connected. 

 

Lamp is correctly inserted. 

 

Battery is connected 

 

Fault:    Lamp illuminates in emergency mode, but only stays on for a short period. 

Check:  Battery has been allowed to charge for at least 24 hours. 

 

Battery for damage. 

 

 

Rated Emergency Lumen Output in accordance with AS2293.1 (refer to 

spacing tables for installation positions):

 

 

 

Refer to the Technical Label for classification information. 

Caution:

 

On many building sites, power circuits may be cut off in an uncontrolled and repetitive basis during 

construction. As a result, any Exit & Emergency Units, on these circuits, will have their batteries 

discharged or “cycled”. The battery in this fitting has been selected to give excellent long-life performance 

in a controlled AS2293 testing environment. Excessive battery cycling will reduce through-life 

performance and may lead to premature battery failure. Battery warranty claims, as a result of such 

abuse, are specifically EXCLUDED from Clevertronics warranty terms. 

Warranty:

 

For Product Warranty information and Terms and Conditions of Sales please refer to our website 

http://clevertronics.com.au/terms-conditions-sale-australia-nz/

 

 

 

 

Installation: 

 

This CWP2LIFE-PRO-WPPOD Surface mount non-maintained Emergency Luminaire can be installed 

on solid or T-BAR ceilings or used to replace an existing unit. 

 

Locate the installation position. 

 

Pre-drill mounting holes per diagram below. 

 

Removed fitting cover. 

 

Use suitable fixings to fasten the fitting to the mounting surface. 

 

Taking note of the terminal block position, drill a hole in the fitting box to suit the cable gland or 

conduit to be used for power entry. 

 

Terminate the supply cables to the L, N & E terminals (in the case of the –DALI or –DATA fittings 

terminate the DALI or DATA cable to the terminals marked Da Da or DATA). 

 

Ensure the Batteries and POD cables are connected. 

 

Screw the cover to the base. 

 

If the CTP capabilities are activated, please affix the CTP status label to a visible surface and 

Four Segment Marking on the product will include an ‘’F’’ in third segment block. 

 

Networking: 

 

When installing the product on a monitored network, (ZONEWORKS, DATA, HIVE, DALI) simply insert 

the relevant Smart Node PCA.  

 

  

 

 

 

 

  

 

Reviews: