background image

1947471 

V1.5  

23 June 2022 

Instruction Sheet Template - V1.3 

 Updated 20/01/2022 

Clevertest and Clevertest Plus 

 

Refer to the supplementary operation guide supplied with the Product.

 

 

After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red 
flashing for a period up to 2 minutes. 

 
The front cover will require removal to gain access to the Test/Status Switch and LED. 

Zoneworks, HIVE (HV/HVG) and DATA Monitored Options

 

Fittings with part numbers -ZW

, -HV, - HVG, -DATA 

are fitted with Zoneworks communications modules 

(nodes).  These  fittings  are  monitored  using  either  Powerline  Carrier  Technology  that  utilize  the  power 
cable to provide data communication, RF transceiver modules operating in the ISM band or a dedicated 
data cable to/from data routers installed on a dedicated data trunk connected to a central Server (can also 
be  connected  via  Ethernet/Internet/Fibre).  Zoneworks  software  on  the  server  is  used  to  monitor, 
coordinate testing and collate test data from each fitting. Zoneworks Fittings can be commissioned by a 
single push of the test switch or by scanning the supplied barcode. The LED Test Switch indicator provides 
a multifunction indication of the status of the fitting during testing and normal operation: 

Option 

State 

LED Operation 

ZW, HV, HVG, 
DATA 

Commissioned 

LED on Solid (Green) 

ZW, DATA 

Un-commissioned 

Batt plugged-in:

 yellow 1s, green 1s 

Batt unplugged:

 red 1s, off 1s 

HV, HVG 

Un-commissioned 
With network connectivity 

Batt plugged-in:

 yellow 1s, green 1s 

Batt unplugged:

 red 1s, off 1s 

HV, HVG 

Un-commissioned 
Without network connectivity 

Batt plugged-in:

 yellow 250mS, green 

250mS, yellow 250mS, green 250mS, 
green 1s 

Batt unplugged:

 red 250mS, off 

250mS, red 250mS,off 250mS, off 1s 

ZW, DATA 

Emergency Light Test In Progress 

LED flashes at yellow 5s , 0ff 1s 

HV, HVG 

Emergency Light Test In Progress 

LED flashes at yellow 1s , 0ff 1s 

In the case of the DATA version a 2-

way “figure 8” cable and terminal block facilitates the connection to 

the DATA network via a multi-drop bus (daisy chain connection).  For further information of installation of 
a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA 
version)  

DALI EM Option

 

Luminaires with part numbers having 

-DALI 

are fitted with DALI modules (nodes) that facilitate connection 

and integration to 3

rd

 Party Lighting Control Systems.  Before installing the -DALI luminaire, please confirm 

that the Lighting Control System has the capability to monitor DALI Emergency Luminaires.  The  -DALI 
fitting  will  be  addressed  and  configured  into  the  control  system  by  the  Lighting  Control  System 
Commissioning Technicians and not Clevertronics.   

State

 

LED Operation

 

Commissioned/ Un-commissioned 

LED on Solid (Green) 

Emergency Light Test in progress 

LED flashes at 1s On (Yellow) & 1s Off 

“IDENTIFY COMMAND” 

Lamp and Status LED Flash for 30 seconds 

A 2-

way “figure 8” cable and terminal block facilitates the connection to the DALI network.  DALI 

connections are marked as Da Da.  

Caution:

 

On many building sites, power circuits may be cut off in an uncontrolled and repetitive basis during 
construction. As a result, any Exit & Emergency Units, on these circuits, will have their batteries 
discharged or “cycled”. The battery in this fitting has been selected to give excellent long-life 
performance in a controlled AS2293 testing environment. Excessive battery cycling will reduce through-
life performance and may lead to premature battery failure. Battery warranty claims, as a result of such 
abuse, are specifically EXCLUDED from Clevertronics warranty terms.

 

 

 

 

L10™ Weatherproof LED Exit with Weatherproof 

Remote-Controlled Gear 

Installation & Maintenance Instruction Leaflet

 

 

Victoria (Head Office & 
Manufacturing) 

Website:

 

www.clevertronics.com.au

 

Email:

 

[email protected]

 

Phone:

 +61 3 9559 2700  

Fax:

 +61 3 9559 2799 

New South Wales

 

Phone:

 +61 2 8805 6400 

Fax:

 +61 2 8805 6444

 

Queensland

  

Phone:

 +61 7 3442 9700 

Fax:

 +61 7 3442 9777 

 

South Australia/Northern Territory

  

Phone:

 +61 8 8301 8800 

Fax:

 +61 8 8351 8286 

 

Western Australia

  

Phone:

 +61 8 9207 0000 

Fax:

 +61 8 9207 0088 

 

New Zealand 

Phone:

 +64 800 548 448 

Designed in Australia to comply with the requirements of 
AS2293.3: 2005 and AS/NZS CISPR15: 2017 

NOTE: Standard product codes with this symbol       are enabled 
with Clevertest Plus capability.  Please refer to the operation 
guide supplied with the product for details.

 

Models:  

 

 

LWELED-ww-tt-xx-WM-IPREM -uu-yy-vv-zz

 

Testing: 

 

 

 

Options:

 

 

Manual Test 

 

xx = Blank 

 

 

4 Hour Runtime

 

yy = 4HR 

Zoneworks

 

xx = ZW 

 

 

Theatre

 

ww = TH 

Z/W DATA  

 

xx = DATA 

 

 

Tamperproof 

uu = TP 

Zoneworks HIVE

 

xx = HV/HVG

  

 

Black 

zz = BLK 

DALI Registered.     

 

xx = DALI 

 

 

Pressure Equalisation Valve 

tt = VENT 

 

 

 

 

 

 

 

 

Spare Parts:

 

1530010 

Replacement Battery 

8002120 

Replacement Emergency LED Board 

AUM01370350001 

Replacement Emergency Driver 

 

Important:

 

It  is  illegal  for  anyone,  except  for  a  licensed  electrician  to  install  or  maintain  this  product.  Before  installation, 
ensure  that  the  electricity  supply  has  been  switched  off  and  isolated.  Installation  must  be  carried  out  in 
accordance with the relevant Australian and International Standards. 

Warranty:

 

For  Product  Warranty  information  and  Terms  and  Conditions  of  Sales  please  refer  to  our  website 

http://clevertronics.com.au/terms-conditions-sale-australia-nz/

 

 

 

 

 

 

Reviews: