13
/
16
Clenergy China
Tel86 592 311 0088
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Fac86 592 599 5028
Xiang'an District 361101, Xiamen, Fujian, China
4.3.4 Repeat the above
steps to install other rails.
Make sure the rails in the
same line aligned over
same
horizontal level.
Ensure the distances of
rails between two adjacent
rows conforming to the
engineering drawings and
the end faces of all rails
aligned.
Recommended Torque:
M8: 18~20 N•m
Figure 11