8 / 12
No. 999-1009, Min’an Avenue, Xiang’an 01/10 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
4.2.
Steel Cap Assembly
Installation
Connect the pole and Steel Cap
Assembly with the M20x210 Hex Bolts,
square ribbed washers (both sides),
round washers, spring washers and
nuts as shown.
Connect the 2 pieces of Steel Cap
sheet with M20x160 hex bolts,
washers, spring washers, and nuts.
Note:
Do not tighten these M20 bolts
prior to completing the assembly of
Rectangular Tube-Master.
All the head of bolts should be at
the same side.