background image

 

8 / 12 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                      01/10 Duerdin , 

Xiamen China 361006                                                                                                                             Clayton VIC 3168 
Tel: +86-592-5781288                                                                                                                      Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                    Fax: +61-3-90176668 
Email: 

[email protected]

                                                                                              Email

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                            Website: www.clenergy.com.au 

 

4.2. 

Steel Cap Assembly

 Installation 

Connect the pole and Steel Cap 
Assembly with the M20x210 Hex Bolts, 
square ribbed washers (both sides), 
round washers, spring washers and 
nuts as shown. 
Connect the 2 pieces of Steel Cap 
sheet with M20x160 hex bolts, 
washers, spring washers, and nuts. 
Note:  

  Do not tighten these M20 bolts 

prior to completing the assembly of 

Rectangular Tube-Master.  

  All the head of bolts should be at 

the same side. 

 

 

 

 

 
 

Summary of Contents for PV-ezRack PostMount 4-A

Page 1: ...Updated on 2017 11 30 PV ezRack PostMount 4 A with ECO Rail Installation Guide V2 0 Content 1 Introduction 1 2 Tools and Components 2 3 System Overview 3 4 Installation Instructions 7 5 Warranty 12...

Page 2: ...lease review this manual thoroughly prior to installing PV ezRack PostMount 4 A Before system installation please read the installation instruction manual carefully The manual provides the following c...

Page 3: ...n key 6mm Spanner 14 22mm adjustable Torque Wrench with socket and also 14 17 and 22mm Hex key attachment Tape Measure 5m Note tools in the figure are only used for rack system not included in supply...

Page 4: ...5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au 3 System Overview 3 1 Overview of PV ezRack PostMount 4 A 1 Un...

Page 5: ...or 40 engine oil to fasteners prior tightening to avoid galling or seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force unifo...

Page 6: ...ton VIC 3168 Tel 86 592 5781288 Tel 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website www clenergy com au 4...

Page 7: ...A is to be optimized to site specific conditions for each project and documented in a construction drawing As a result major components of the Clenergy PostMount 4 A may be provided in section sizes...

Page 8: ...00 1800mm Cover the bottom of the hole with 50 70mm gravel Place the pole into the middle of the hole and fill it with concrete Maintain the position of the post to an allowed vertical tolerance of 2...

Page 9: ...ebsite www clenergy com au 4 2 Steel Cap Assembly Installation Connect the pole and Steel Cap Assembly with the M20x210 Hex Bolts square ribbed washers both sides round washers spring washers and nuts...

Page 10: ...washer and nut Refer to 4 3 3 Connect the Adjustable Tube to the Steel Cap with the M20x160 hex head bolt washer spring washer and nut You can set the required tilt angle 10 60 through the different...

Page 11: ...he connection and avoid sway 4 4 Angle Bracket Rectangular Tube Master Installation 4 4 1 Preassemble the Cross Connector Clamp at the Angle Bracket with M8 28 socket head cap bolts washers spring was...

Page 12: ...ck of the ECO Rail Repeat this for all eight fixing points and then tighten the M8x28 socket head bolts Recommended Torque M8 18 20Nm Finally adjust the rails until dimensions D1 D2 and D3 D4 and D5 D...

Page 13: ...ance for Architecturally Finished Aluminum www aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This...

Reviews: