background image

Industrial Ethernet Unmanaged

8

Wall Mounting Procedure

All Industrial switches from the SSF-RUGGED series have DIN rail bracket 

mounted from factory to the rear panel of the unit. If wall mounting is needed, first 

remove the pre-installed DIN rail bracket. 
Secure the wall mounting brackets to the switch as in the below diagram. You will 

need 4x M3 screws for the wall mounting brackets (included) and screws for wall 

securing that should have head diameter larger than 6mm and screw body less 

than 3.5mm (these screws are not included in the package).

 

 

Warning

1. 

Use only indoors in climate-controlled environments.

2. 

Avoid looking directly into fibers or lasers while unit is powered.

3. 

9-52V DC wide power input (48-52V DC for PoE PSE models) - not included.

FCC and CE markings

This equipment has been tested and found to comply with the limits for a Class 

B digital device, pursuant to part 15 of the FCC Rules. These limits are designed 

to provide reasonable protection against harmful interference in a residential 

installation. This equipment generates, uses and can radiate radio frequency 

energy and, if not installed and used in accordance with the instructions, may 

cause harmful interference to radio communications. 
This is a CE class B device, intended to be used in residential, commercial or 

industrial applications.

Summary of Contents for SSF-1x4POE-RUGGED

Page 1: ...SSF 1x2 RUGGED SSF 1x4 RUGGED SSF 1x4POE RUGGED Industrial Ethernet Switch Manual www cleerlinefiber com...

Page 2: ...each UTP port supporting 802 3at PoE standard Reliability is highly ranked with an MTBF exceeding 120 000 hours All Industrial Ethernet models listed in this manual have passed IEC standards as descri...

Page 3: ...950 CE LVD EN60950 CE LVD EN60950 Power input DC 48 52V DC 9 56V DC5V DC 48 52V Reverse Polarity Protection Yes Yes Yes PoE budget 60W None 120W Max PoE power per port 30W n a 30W Mounting DIN rail br...

Page 4: ...ESD Level 3 Criteria B EN 61000 4 3 RS Level 3 Criteria A EN 61000 4 4 EFT Level 3 Criteria A EN 61000 4 5 Surge Level 3 Criteria B EN 61000 4 6 CS Level 3 Criteria A EN 61000 4 8 PFMF Magnetic Field...

Page 5: ...king data traffic present UTP GREEN Off 10M 100M On 1000M on RJ45 port UTP YELLOW Off No link On UTP link OK Blinking data traffic present SYS Off Switch failed On Switch operating normally Note Gigab...

Page 6: ...d PWR2 Observe voltage polarity when wiring power to the screw block connector Complete wiring without hot wires and with screw block connector disconnected from switch Installation Warning Ensure pro...

Page 7: ...nit If wall mounting is needed first remove the DIN rail bracket If DIN rail bracket needs to be reattached make sure the spring is located on top position when unit is vertical Step 1 Step 2 Hold uni...

Page 8: ...1 Use only indoors in climate controlled environments 2 Avoid looking directly into fibers or lasers while unit is powered 3 9 52V DC wide power input 48 52V DC for PoE PSE models not included FCC and...

Reviews: