Industrial Ethernet Unmanaged
8
Wall Mounting Procedure
All Industrial switches from the SSF-RUGGED series have DIN rail bracket
mounted from factory to the rear panel of the unit. If wall mounting is needed, first
remove the pre-installed DIN rail bracket.
Secure the wall mounting brackets to the switch as in the below diagram. You will
need 4x M3 screws for the wall mounting brackets (included) and screws for wall
securing that should have head diameter larger than 6mm and screw body less
than 3.5mm (these screws are not included in the package).
Warning
1.
Use only indoors in climate-controlled environments.
2.
Avoid looking directly into fibers or lasers while unit is powered.
3.
9-52V DC wide power input (48-52V DC for PoE PSE models) - not included.
FCC and CE markings
This equipment has been tested and found to comply with the limits for a Class
B digital device, pursuant to part 15 of the FCC Rules. These limits are designed
to provide reasonable protection against harmful interference in a residential
installation. This equipment generates, uses and can radiate radio frequency
energy and, if not installed and used in accordance with the instructions, may
cause harmful interference to radio communications.
This is a CE class B device, intended to be used in residential, commercial or
industrial applications.