![Cleco 935377 Instruction Manual Download Page 22](http://html.mh-extra.com/html/cleco/935377/935377_instruction-manual_2622103022.webp)
22
P1970E/INT 2015-06
2070b_1_5en_bedingt.fm, 13.10.2015
Safety
1
1.5
Items supplied
Check shipment for transit damage and ensure that all items have been supplied:
1 Rechargeable battery
1 Instruction Manual
1.6
Transport
The contained lithium-ion batteries are subject to the Dangerous Goods Legislation requirements.
Observe special requirements on packaging and labeling when being transported.
1.7
Storage
WARNING!
Do not bring any electrically conducting objects such as paper clips, coins, keys, nails or screws in
contact with the battery contacts.
When storing the battery outside the tool or the battery, vapours may be emitted. Provide for fresh air
and seek medical help in case of complaints. The vapours can irritate the respiratory system.
935390
Li-Ions 26 V (110 – 230 VAC), 1-fold
935391
Li-Ions 26 V (110 – 230 VAC), 1-fold
Danger of explosion from short circuit
It is vital that battery is recharged within the specified period in order to prevent total discharge and destruc-
tion.
Time period
Storage
temperature
Relative
humidity
Supplemental information
5000 h / 200 days –
maximal, without
thrickle charging.
-4 to 113 °F
(-20 to +45 °C)
0 to 80 %
100% store charged.
Recharge after 5000 h / 200 days
to prevent deep discharging (< 17.5 V).
Order no.
Battery charger
ATTENTION
!
EN
Summary of Contents for 935377
Page 1: ...Battery pack 26 V Li Ion 935377 Instruction Manual P1970E INT 2015 06...
Page 2: ...2 P1970E INT 2015 06 1970a_ Deckblatt_en fm 13 10 2015...
Page 11: ...2070b_1_5 cs_bedingt fm 13 10 2015 P1970E INT 2015 06 11 Likvidace 9...
Page 19: ...2070b_1_5 de_bedingt fm 13 10 2015 P1970E INT 2015 06 19 Entsorgung 9...
Page 27: ...2070b_1_5en_bedingt fm 13 10 2015 P1970E INT 2015 06 27 Disposal 9...
Page 35: ...2070b_1_5 es_bedingt fm 13 10 2015 P1970E INT 2015 06 35 Eliminaci n 9...
Page 43: ...2070b_1_5 fr_bedingt fm 13 10 2015 P1970E INT 2015 06 43 Mise au rebut 9...
Page 51: ...2070b_1_5 it_bedingt fm 13 10 2015 P1970E INT 2015 06 51 Smaltimento 9...
Page 59: ...2070b_1_5 pl_bedingt fm 13 10 2015 P1970E INT 2015 06 59 Utylizacja 9...
Page 67: ...2070b_1_5 pt_bedingt fm 13 10 2015 P1970E INT 2015 06 67 Descarte 9...