CLEARSTREAM INSTALLATION INSTRUCTIONS
Before installation of the Clearstream Treatment Tank, first install a pretreatment tank
(septic tank) with a volume of not less than 50% of the gallon per day rating of the
Clearstream Unit. Pretreatment tanks shall comply with minimum sizing specifications
outlined in the Clearstream specifications section.
UNLOADING/PACKING INSTRUCTIONS:
1.
All compressors are packaged to prevent damage during shipping and handling.
2.
Please be careful during shipping or handling of the linear compressors
they are
fragile and can be damaged if dropped from only a short distance. If dropped
hard
enough the cast aluminum housing may be damaged and render the compressor
usele
ss.
3.
The most common issue resulting from a linear compressor being handled inappropriately is the
safety switch being tripped. Please refer to the repair manual for switch reset instructions if the
compressor fails to power up.
4.
All control panels are packaged to prevent damage during shipping and handling.
5.
Clearstream
electrical control
panels are fragile and should be handled as such during
shipping
and handling. All
electrical control
panels have circuit breakers, lights and
electrical connections
and many have relays and timers that are all fragile. Components
may be replaced
if damaged but if the panel enclosure its self is damaged the panel may
be rendered
useless.
5
of 1
2