Revision date: 03.03.14
SQUARE THE ASSEMBLED FRAME
Gather the Parts
• Measuring tape
• Tek Screws
Complete these steps:
1. Square the frame by measuring diagonally corner-to-
corner, and align all rafters as shown below.
2. Verify that the width of each rafter is 11' 4" center-to-
center.
END CONDUIT ASSEMBLIES
Gather the Parts:
• Pipe 1.315'' x 66'' Plain (2)
• Pipe 1.315'' x 69'' Swaged (2)
• T-Fittings (10015106)
• Duct tape (supplied by customer)
• Tek Screws
• Metal-Cutting Saw
Assembly Procedure:
1. Locate the end conduit pipes and T-fittings. Each
end conduit consists of one (1) 66'' pipe, one (1) 69''
pipe, and two (2) T-fittings. Two (2) end conduits are
required.
2. Assemble an end conduit by connecting a 69'' swaged
pipe to a 66'' plain pipe and secure the joint using a Tek
screw.
FRAME TOP VIEW
3. Tape over the Tek screw to protect the end panel.
4. Repeat assembly for the remaining end conduit.
5. Add the T-fittings at the ends of the conduits.
NOTE:
Do not insert the end conduit pipes all the way
into the T-fittings, but instead allow room for the end
rafter to be inserted later.
NOTE:
The frame is square when the two diagonal
measurements are the same.
3. Tape all rafter splices with duct tape to protect the main
cover when it is installed.
4. Verify that all pipe splices and clamps are secured
using Tek screws.
FINISH ROUGH EDGES
Gather the parts:
• Duct tape (supplied by customer)
• Metal file (may not be needed)
1. Check for any sharp edges on the frame and file them
smooth so they will not cut the cover.
2. Apply two layers of heavy duct tape on all pipe
connections and clamps that may contact the cover.