13
CLEARSPAN
™
POLY BUILDINGS
Visit
www.ClearSpan.com
for additional products and customer assistance.
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building.
All inserts are viewed from inside of the shelter.
Customer-Supplied
Baseboard
ATTENTION:
The cable positions are identical for
both sides of the frame. All cable assemblies are
positioned at the ends of the frame regardless of
the frame length. Consult the Quick Start diagram
for your shelter for additional details.
All inserts show the circled locations as seen
standing inside the frame.