
CLEARSPAN
™
HIGH-CROWN ARENA
8
Revision date: 09.25.15
2
INSTALL THE SIDEWALLS
Once concrete is set, install sidewalls.
NOTE:
The gate of the corral is assembled differently
and includes different pipe. The procedure to
assemble and install the gate is described in a later
step.
Complete these steps. Consult Quick Start diagrams.
1. Locate the pipe sections for three (3) horizontal
sidewall frame tubes for one sidewall and
assemble each tube.
NOTE:
Each horizontal frame tube consists of one (1) drilled 99" swaged pipe (#190S099D) and one
(1) drilled 79.5" plain pipe (#190P0795D).
Insert the swaged ends of the 99" pipes into the non-drilled plain ends of the 79.5" plain pipes.
2. Slide a single-socket tee coupler (#10015108) onto two (2) of the assembled frame tubes (top and
bottom) and a two-socket cross connector (#10015808) onto the third frame tube (middle).
3. Locate six (6) 104302 pipe fittings w/base. Remove and discard the bases from each fitting, leaving the
pipe ends and fasteners.
4. Using a 5/16" x 2" bolt, 5/16" nut, and the pre-drilled holes, attach one pipe end (see previous step) to
each end of the frame tubes.
NOTE:
Verify that the orientation of the pipe ends match at each end of each frame tube. Adjust pipe
assembly as needed.
TOP
190S099D
190S099D
190S099D
190P0795D
190P0795D
190P0795D
MIDDLE
BOTTOM
MIDDLE
10015108
10015808
TOP
&
BOTTOM
2
1
NOTE:
Set carriage bolts, lock
washers and nuts aside for a
later step.
3
Discard
base.
Use as
pipe end in
next step.
4
FAG336B
bolt
FALB02B
nut
Pipe
End
Gate
Opening