background image

9

CLEARSPAN

 FABRIC STRUCTURES

Revision date: 09.08.09

D

C

B

A

A

B

C

D

1

2

3

4

5

6

7

8

8

7

5

6

4

3

2

1

E1-1.0

Engineering Approval

Manger Approval

Design Approval

Shelter Descriptio

n

Shelter Dimensions

S

he

lte

r S

ku

 N

um

be

r

D

ra

w

B

y

C

re

at

io

D

at

e

La

st

 R

ev

is

io

D

at

e

108539

1/2"x 4 1/2" Bolt 

& 1/2" Nut 

1/2"x 5 1/2" Bolt 

& 1/2" Nut 

 End Rafter

105350

Purlin Connection

Bracket

Rafter Coupler

(See Detail Below)

Mid Rafter

105350

Purlin Connection

Bracket

3/8"x 1" Bolt

& 3/8" Nut

108539

1/2"x 5 1/2" Bolt 

& 1/2" Nut 

1/2"x 4 1/2" Bolt 

& 1/2" Nut 

QH1065

Ratchet

108539

CONNECTION - DETAILS

View 1

End Rafter-Purlin

Connection

View 2

Rafter-Foot

Connection

3/17/2009

View 3

Mid Rafter-Purlin

Connection

Rafter-Foot

Connection

Rafter Coupler

(See Detail Below)

Rafter

108807

Foot Assembly

108803

Coupler Assembly

Rafter

Rafter

Rafter-Coupler

Connection

38

'W

 x

 1

6'

-1

 3

/4

"H

 x

 4

0'

L

C

L1

08

54

3

38

' x

 4

0'

 E

co

no

m

B

ui

ld

in

g

Summary of Contents for CL108543

Page 1: ...e Front Profile Side Profile Connection Call Out Last Revision Date Connection Details 1 66 Round 3 17 2009 CONTENT GUIDE Width Center Center Sidewall Height Rafter Spacing Length Center Center Rafter Tubing Cover Conduit Tubing Height Ground Peak Purlin Tubing of Runs Cover Info End Wall Door Rafter Pipe Details 12 5oz 1 66 Purlin 5 Runs 4 00 Round End Wall Tubing End Panel Info Shelter Informati...

Page 2: ...s an important step before you begin to assemble the structure Always consult local and regional building codes before you begin The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structur...

Page 3: ...ons before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are inserted and secu...

Page 4: ...do not need to open the plastic bags containing the fasteners if used SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Inspect the shelter and all components frequently and regularly Regularly check the main cover and panels if equipped to see that these remain tight and in proper repair C...

Page 5: ...t can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle After squaring the position of the building and placing a stake at all corners 3 string a line between the stakes to mark the base of the building Next mark a line on the ground using the strings between the stakes as...

Page 6: ...ter Description Shelter Dimensions Shelter Sku Number 38 x 40 Economy Building Drawn By Creation Date Last Revision Date CL108543 FRONT PROFILE B1 1 0 3 17 2009 38 W x 16 1 3 4 H x 40 L 38R40P1D 38R40P3D 108807 108807 38R40P2D 38R40P1D 38R40P2D 38R40P4D 38R40P3D Ground Level QH1061 Ratchet Attach to End Rafters only QH1061 Ratchet Attach to End Rafters only ...

Page 7: ... Sku Number Shelter Dimensions Shelter Description Design Approval Manger Approval Engineering Approval CL108543 108539 Cable Cable 108539 108539 R R R R R R NOTE R indicates ratchet locations 108539 Side Wall Cable Assembly F1 1 0 View 1 8 0 Rafter Spacing Center to Center 40 0 Length 4 166S099 1 166P096 1 66 Cover Conduit Pipe Assembly Purlin Tek Screw Connection F1 1 0 View 2 Secure QH1065 ratc...

Page 8: ...ter Description Shelter Dimensions Shelter Sku Number Last Revision Date Creation Date Drawn By JReittinger CL108543 D1 1 0 CONNECTIONS 38 W x 16 1 3 4 H x 40 L 3 17 2009 End Rafter Purlin Connection E1 1 0 View 1 Rafter Foot Connection E1 1 0 View 2 Mid Rafter Purlin Connection E1 1 0 View 3 QH1061 ratchet attached to end of end rafter QH1065 ratchet attached to side of same rafter ...

Page 9: ...Purlin Connection Bracket Rafter Coupler See Detail Below Mid Rafter 105350 Purlin Connection Bracket 3 8 x 1 Bolt 3 8 Nut 108539 1 2 x 5 1 2 Bolt 1 2 Nut 1 2 x 4 1 2 Bolt 1 2 Nut QH1065 Ratchet 108539 CONNECTION DETAILS View 1 End Rafter Purlin Connection View 2 Rafter Foot Connection 3 17 2009 View 3 Mid Rafter Purlin Connection Rafter Foot Connection Rafter Coupler See Detail Below Rafter 10880...

Page 10: ...r Sku Number Shelter Dimensions Shelter Description Design Approval Manger Approval Engineering Approval F1 1 0 CONNECTION DETAIL 38 W x 16 1 3 4 H x 40 L 3 17 2009 CL108543 Cable Clamps Cable Clamps Cable Thimble Jaw Jaw Turnbuckle Cable Thimble View 1 Side Wall Cable Assembly View 2 Conduit Tek Screw Connection Typical cable to frame connection Customer Supplied Baseboard ...

Page 11: ... 7 3 8 BEND LCTN N A DEGREE N A DRILL 9 16 38R40P4D DIA GA 4 00 10 GA PRE BEND 6 8 1 2 TYPE Plain PT TO PT 6 7 1 4 BEND LCTN N A DEGREE N A DRILL 9 16 38R40P3D DIA GA 4 00 10 GA PRE BEND 6 8 1 2 TYPE Plain PT TO PT 6 7 1 2 BEND LCTN N A DEGREE N A DRILL 9 16 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Last Revision Date 38 x 40 Economy Building Shelter Sku Number Shelter...

Page 12: ...6 1 1 4 8 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Last Revision Date 38 x 40 Economy Building Shelter Description Shelter Dimensions Shelter Sku Number Design Approval Manger Approval Engineering Approval H1 1 0 MAIN COVER DETAILS 38 W x 16 1 3 4 H x 40 L 3 17 2009 CL108543 Over The Top Measurement 54 4 652 ...

Page 13: ...ions of pipe needed to assemble a the cover conduit Insert the swaged end of each pipe into the b plain end of another pipe until the conduit is assembled See Side Profile diagram Secure each pipe joint with a Tek screw c Use duct tape to tape over each Tek screw d Locate the main cover and unfold it on a clean smooth surface near the frame Unfold the main cover with the inside surface facing up a...

Page 14: ... has not been properly secured Locate the black straps at the front and rear hems and feed the straps 5 through the center slot in each end ratchet QH1061 Operate the ratchet to wrap the strap onto the center hub just enough to keep the strap secure NOTE Use lifts and additional assistants if needed to help pull the cover up and over the frame Shelter shown above may be a different style or length...

Page 15: ...e locations when the main cover was pulled in place a slit in the cover pocket may already be present NOTE Do not tighten completely at this time Frame and ratchet location differ from actual frame Steps to install the main cover are similar however Feed one end through the slot in the cover pocket and around the conduit 3 Feed both ends of the strap through the slot in the ratchet and slightly 4 ...

Page 16: ...sults in a more uniform appearance Move to another rafter and repeat the steps to tighten the side ratchets 3 attached to that rafter NOTE If the strap builds up in the ratchet loosen the ratchet remove some of the strap and retighten After all side ratchets QH1065 are tight position someone at each ratchet 4 attached to the end rafter where the bonnet straps of the cover were previously inserted ...

Page 17: ...17 CLEARSPAN FABRIC STRUCTURES Revision date 09 08 09 This page is reserved for customer notes ...

Reviews: