5. After all side straps are in place and slightly tightened
and cover is centered evenly on frame, complete the
following steps to install the PVC cover conduit.
NOTE:
The following procedure applies to shelters
longer than 48'
.
If building is 48' long or shorter, skip the next section
and continue by tightening side ratchet
s
as described
on Page 27.
4. Repeat previous steps to install and slightly tighten remaining straps. Photos below show examples of pony wall
shelters and how to attach ratchets to secure main cover.
INSTALL MAIN COVER SIDE STRAPS–continued