FRAME ASSEMBLY (CONTINUED)
13. Repeat previous steps to set and secure all remaining interior rafters.
14. As purlin pipes are added, secure each pipe splice using a Tek screw.
15. Finally, set remaining end rafter, which includes QH1070 pipe straps, and finish each purlin run using a XX" pipe
(131P0XX). Position plain finish pipe between last interior rafter and final end rafter to complete the assembly.
Consult the spec sheet and Side Profile diagrams (Quick Start) for "XX" pipe identification.
NOTE:
Cables shown in the diagram above are installed in the next procedure. Ratchets are shown attached to
side of pony wall. These are installed during cover installation steps.
16. With frame assembled, continue with cable assembly and installation.
ATTENTION:
If last pipe extends beyond
end rafter
after
end rafter is straight/
plumb, cut pipe as needed. Do not allow it
to extend beyond end rafter.