19
CLEARSPAN
™
POLY BUILDINGS
Revision date: 05.19.09
FRONT PROFILE
1.66 BAND CLAM
P
20R1601
20R160
1
20R1601
20R160
2
166S027
D
166S027D
ONLY PLACED ON END RAFTER
S
RAFTER MOUNTING FOOT
104301
RAFTER MOUNTING FOOT
104301
(CENTER OF SHELTER)
PURLIN CONNECTION
(HEIGHT VARIES BY STRUT POSTION)
PURLINS ARE CONNECTED TO MID
)
OVER PIPE CONNECTIO
N
(
PURLIN CONNECTIO
N
)
OVER PIPE CONNECTION
(
PURLIN CONNECTIO
N
)
8" FROM GROUND
(
PURLIN CONNECTION
)
8" FROM GROUND
(
SECURED USING A TEK SCREW
PLACED ON END RAFTERS NEAR BOTTO
M
QH1061-RATCHE
T
SECURED USING A TEK SCREW
PLACED ON END RAFTERS NEAR BOTTO
M
QH1061-RATCHE
T
END RAFTER USING END CLAMPS
.
ALL PURLINS ARE CONNECTED TO TH
E
NOTE
:
RAFTERS USING CROSS CONNECTORS.
PURLIN CONNECTION
1.66 BAND CLAM
P
ONLY PLACED ON END RAFTER
S
(HEIGHT VARIES BY STRUT POSTION)
Pony W
all
Pony W
all
20' On-Center