CLEARSPAN
™
POLY BUILDINGS
12
107764_65 Revision date: 05.20.19
NOTE:
Verify that the bolt heads are to the outside of
the shelter and tighten the nuts.
3. Install the remaining struts and tighten all band clamp
bolts.
4. Secure each band clamp to the purlin and rafter using
a Tek screw for each connection.
5. Return to each purlin joint and secure using a Tek
screw.
90°
Strut
FRAME ASSEMBLY (CONTINUED)
SQUARE THE ASSEMBLED FRAME
Gather the parts: Measuring tape and Tek screws
Complete these steps:
1. Square the frame by measuring diagonally corner-to-
corner and align all rafters as shown below.
2. Verify that the width of each rafter is 20' center-to-
center. The frame is square when the two diagonal
measurements are the same. See previous diagram.
3. Continue by anchoring the frame.
ANCHOR THE FRAME
Once the frame is anchored properly, continue with these
instructions.
WARNING
: Securing the rafter base plates to boards
set on the site is not a substitute for properly anchoring
the shelter. You must anchor the shelter as described in
the MUST READ document.
FAILING TO PROPERLY ANCHOR THE SHELTER
WILL RESULT IN DAMAGE TO THE SHELTER AND
MAY CAUSE PERSONAL INJURY.
READ THE MUST READ DOCUMENT TO PROPERLY
ANCHOR THE SHELTER.
After anchoring the frame, check the frame for rough
edges as described in the following procedure.
2. Remove the bolts and attach a strut between the band
clamp on the purlin and the band clamp on the end
rafter. Position the strut so that it forms a triangle as
shown below.
Actual strut and position may vary.
FINAL FRAME CHECK
1. Return to all frame connections and verify that bolts are
tight, including all base plate bolts.
2. Verify that each purlin splice is secured with a Tek
screw.
3. Verify that each purlin is secured to the end clamp and
cross connector and that each cross connector and
end clamp is secured to the rafter. See diagram below.
4. Inspect the frame for sharp areas that could damage
the cover. If found, file smooth and cover with layers of
duct tape to protect the cover.
5. Verify that all bolts are positioned with the heads to the
outside of the frame. Tape the bolts and rafter joints
before
installing the cover.
6. Continue by installing the main cover.
Cross Connector
to Rafter Tek
Screw
Purlin to Cross
Connector Tek
Screw
Rafter
Purlin
ATTENTION:
Rafter
shown may differ
from the actual
rafter. Steps to
secure the purlin to
the connector and
the connector to the
rafter are the same.
Position the Tek
screws so they will
not touch the cover
once it is installed.
FRAME TOP VIEW