background image

CLEARSPAN

 FABRIC STRUCTURES

7

Revision date: 01.23.09

End Rafter

Ground Post

Ground Level

12' 

on-center

8' 

on-center

4' 

on-center

Interior Rafter

Leg

Actual frame may differ in length from frame shown.

Purlin

Door Header

Ridge Purlin

ClearSpan

 Storage Master 

Shed Row

OVERVIEW

This section describes assembling your shed row building. 

For details of each assembly procedure, consult the 

Quick Start Guide and the individual sections of these 

instructions. See illustration below to identify main parts of 

the building.
1.  Select a location for the building.
2.  Identify the parts for each assembly procedure.
3.  Assemble all rafters.
4.  Assemble and anchor the frame.
5.  Prepare and install end panels.
6.  Prepare and install the main cover.

Summary of Contents for 104486W

Page 1: ... may show a model of a different length Optional side panel shown above requires an additional purchase 2009 ClearSpan All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS 104486W 12 W x 16 L 104487W 12 W x 24 L 104488W 12 W x 32 L 104489W 12 W x 40 L optional panel ...

Page 2: ...the structure Failing to anchor the shelter properly will void the manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Ident...

Page 3: ...s before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are inserted and secure...

Page 4: ...or a quick overview of this shelter and its components consult the Quick Start Guide near the back of these instructions The pages of the Quick Start Guide show exploded views of all critical connections Use the diagrams in the Quick Start section along with detailed assembly steps to complete the frame of your building Consult the remainder of these instructions for important details that will he...

Page 5: ...ferent parts of the building Some parts are not shown FA4482B Tek Screw QH1061 Ratchet 100441 Nut Setter Pictorial Parts Guide 102675 Ground Post CC6213 Fabric Clip QH1073 Post Driver 102193 3 Way Coupler 102194 4 Way Coupler Swaged Plain Swaged and Plain Rafter Sections 103620b Plain End Strap 10015407 Adjustable Tee ...

Page 6: ...rsonal injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end panels once these are installed 4 Way Coupler no lock bolt 4 Way Coupler includes lock bolt ADDITIONAL PARTS IDENTIFICATION NOTES In some instances there can be differences between th...

Page 7: ...Row OVERVIEW This section describes assembling your shed row building For details of each assembly procedure consult the Quick Start Guide and the individual sections of these instructions See illustration below to identify main parts of the building 1 Select a location for the building 2 Identify the parts for each assembly procedure 3 Assemble all rafters 4 Assemble and anchor the frame 5 Prepar...

Page 8: ...uare 7 Check all dimensions and adjust if needed before driving the remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter The string is used to identify the tops of all remaining ground posts The string must remain tight and level 9 Determine which side will be the open ...

Page 9: ... shown above may differ from your shelter Diagram used for illustration purposes only 13 Verify that the diagonal dimensions of the frame are the same when measured as shown below NOTE The frame is square when the two diagonal measurements are the same After the rafters have been assembled the rafter ends are secured to the ground post using the upper hole 14 Continue with the Rafter Assembly step...

Page 10: ...ouplers attach each rafter pipe using a Tek screw 4 Repeat for the other end rafter ASSEMBLE THE OPEN FRONT SIDE The end rafters and every other rafter receive legs The length of the building determines the number of legs required See diagrams in the Quick Start section for the designated number Gather the parts Pipe 166P096D Pipe 166P094 Adjustable Tee 10015407 3 Way couplers 102193 4 Way coupler...

Page 11: ...oupler on the remaining end rafter Inside of Shelter Outside of Shelter Rafter Ground Post 102193 3 Way Coupler Rafter Leg Inside Rafter Leg 102194 4 Way Coupler ASSEMBLING THE OPEN FRONT SIDE CONTINUED 7 Locate the 94 pipes 166P094 required to assemble the door header Slide an adjustable tee fitting 10015407 onto each pipe and insert into the couplers between each rafter leg as shown below Actual...

Page 12: ...Insert a 46 purlin pipe 166P046 into each of the 3 Way couplers and tighten the lock bolts 5 Place the interior rafter assembly into the second ground post and secure the rafter to the ground post as previously described 6 Slide the other end of the rafter into the adjustable tee previously installed on the door header IMPORTANT Brace the first rafter in position as needed to keep it from moving B...

Page 13: ...of the other Drive a Tek screw into the pipe joint 3 Wrap the Tek screw and pipe joint with two layers of duct tape to protect the end panel 7 Slide the end panel conduit into the end panel pocket 9 With the proper lift or ladders positioned inside the frame and with assistance pull the end panel up and over the top of the end rafter Square the end panel on the end frame and verify that the bottom...

Page 14: ...l tie downs feed the stretch cord through a grommet and attach the panel to the leg rafter Use one snugger ball for each grommet INSTALL END PANELS continued 1 2 3 NOTE A space will remain between the cover edge and the frame as shown in the diagrams 15 Repeat the previous steps to attach the remaining end panel to the opposite end of the frame 16 Continue with the ratchet installation ATTACH SIDE...

Page 15: ... the bonnet portion of the main cover Use the pre installed cover strap after main cover is pulled onto the frame to adjust the height of these end ratchets if needed Gather the parts Ratchets QH1061 Tek screws Complete these steps to attach the end ratchets 1 Move to the end of the assembled frame and attach one ratchet to each leg of the end rafter ATTENTION Attach the end ratchet at the closed ...

Page 16: ...ighten and secure the cover 4 After assembling the cover conduits locate the cover and unfold it on a clean smooth surface near the frame NOTE When handling the cover and setting it in position do not pull on the end straps They will pull out of the cover Unfold the cover with the inside surface facing up and the skirt portion positioned toward the closed back side of the frame NOTE Shelter shown ...

Page 17: ... not purchased the optional side panels read the Care and Maintenance section near the front of this manual INSTALL MAIN COVER continued INSTALL OPTIONAL PANELS if equipped Side panels are available for the shelter and provide additional protection from the elements and other sources that could damage the contents of the shelter To purchase the optional panels for your shelter contact Customer Ser...

Page 18: ...S 18 Revision date 01 23 09 QUICK START GUIDE 12 Wide Storage Master Shed Row Building Sidewall 12 Height Width 8 0 11 7 5 8 Height Grid Represents 12 Squares FRONT Ground Level Frame shown may differ in length from actual frame ...

Page 19: ...CLEARSPAN FABRIC STRUCTURES 19 Revision date 01 23 09 FRONT PROFILE 102675 102675 Ground Level 166P096D 166P096D Ends 102193 Middle 102194 Ends 102193 Middle 102194 166P077 Ends 102193 Middle 102194 ...

Page 20: ...ROFILE 104486 OPEN FRONT SIDE 8 0 On Center Rafter Spacing 16 0 Length Center to Center Ratchets are attached to the rafters labeled with R R R R 2 166P094 Door Header Pipes Main Cover Conduit 2 131S075 1 131P0495 End Cover Conduit 131S075 131P0735 Ground Level ...

Page 21: ...CLEARSPAN FABRIC STRUCTURES 21 Revision date 01 23 09 SIDE PROFILE 104486 CLOSED BACK SIDE 4 0 On Center Rafter Spacing 16 0 Length Center to Center R R R 8 166P046 Purlin Pipes Ground Level ...

Page 22: ...OFILE 104487 OPEN FRONT SIDE 8 0 On Center Rafter Spacing 24 0 Length Center to Center Ratchets are attached to the rafters labeled with R R R R R 3 166P094 Door Header Pipes Main Cover Conduit 3 131S075 1 131P0735 End Cover Conduit 131S075 131P0735 Ground Level ...

Page 23: ...CLEARSPAN FABRIC STRUCTURES 23 Revision date 01 23 09 SIDE PROFILE 104487 CLOSED BACK SIDE 4 0 On Center Rafter Spacing 24 0 Length Center to Center R R R R 12 166P046 Purlin Pipes Ground Level ...

Page 24: ...FILE 104488 OPEN FRONT SIDE 8 0 On Center Rafter Spacing 32 0 Length Center to Center Ratchets are attached to the rafters labeled with R R R R R R Ground Level End Cover Conduit Main Cover Conduit 131S075 5 131S075 1 131P0255 131P0735 4 166P094 Door Header Pipes ...

Page 25: ...URES 25 Revision date 01 23 09 SIDE PROFILE 104488 CLOSED BACK SIDE 4 0 On Center Rafter Spacing 32 0 Length Center to Center Ratchets are attached to the rafters labeled with R R R R R R 16 166P046 Purlin Pipes Ground Level ...

Page 26: ...ILE 104489 OPEN FRONT SIDE 8 0 On Center Rafter Spacing 40 0 Length Center to Center Ratchets are attached to the rafters labeled with R R R R R R R Ground Level End Cover Conduit Main Cover Conduit 131S075 6 131S075 1 131P0495 131P0735 5 166P094 Door Header Pipes ...

Page 27: ...RES 27 Revision date 01 23 09 SIDE PROFILE 104489 CLOSED BACK SIDE 4 0 On Center Rafter Spacing 40 0 Length Center to Center R R R R R R 20 166P046 Purlin Pipes Ratchets are attached to the rafters labeled with R Ground Level ...

Page 28: ...CLEARSPAN FABRIC STRUCTURES 28 Revision date 01 23 09 CONNECTIONS End Rafter Purlin Connection View 1 Rafter Purlin Connection View 2 Mid Rafter Purlin Connection View 3 Ground Level ...

Page 29: ...sion date 01 23 09 CONNECTIONS DETAILS View 1 End Rafter Purlin Connection View 2 Rafter Purlin Connection View 3 Mid Rafter Purlin Connection 102193 Door Header Rafter Door Header Door Header Rafter 102194 Rafter Adjustable Tee Ratchet ...

Reviews: