
11
CraftSmart FiberFirst Pedestal
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 023112 Rev A - Nov 2022
On the front of the bulkhead, route the splitter leg down on
the outside of the radius fingers, turn up in between the radius
fingers until reaching the desired row, then exit over the top of
the radius finger to the right. Make the connection.
Note:
Inspect before you connect!
7.
8.
9.
When installing additional WaveSmart Ruggedized Splitters, secure the
splitter body on top of the previous one with the same strap. Route the
fibers around the radius limiters on top of the PON insert and down the
front right side of the bulkhead between the radius fingers as shown on the
routing diagram.
Bring the staging plate to the open staging area on the bottom of the PON
insert. Secure into place with the push/pull plungers.