
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
10
CraftSmart FiberFirst Pedestal
Installation Manual
_________________________________________________________
Manual 023112 Rev A - Nov 2022
4.
Route the splitter legs down between the radius fingers on the front
right side of the PON insert.
Bring the splitter staging plate up to the left staging area located at
the base of the PON insert. Place the push/pull plungers into the
holes located at the staging area and push on the plunger to secure
the staging plate to the bulkhead.
5.
When making connections, remove connectors from the staging
plate and route the splitter legs around the radius limiters on top of
the pedestal as shown by the routing diagram. Different lengths of
slack will be taken up depending upon the radius limiter chosen.
6.