5. Installation and commissioning
5.1 Installation location and on-site prerequisites
• Water supply connection
• The supply water must conform to the German Drinking Water Directive
.
• Supply water temperature max. 30°C
• Temperature at application location 4° to 40°C
• Do not erect in the immediate vicinity of heat sources or in direct sunlight.
• The processed water is more or less aggressive depending on the
composition of the supply water. The parts that come into contact with the processed
water must therefore be made of suitable corrosion-resistant
material (e.g. glass, plastic or aluminium).
Copper and other non-ferrous metals are not suitable.
5.2 Assembly and commissioning
1. Connect the hose to the water inlet (1). Slowly open the ballcock and fill the bottle.
Open the cock (2) to vent the unit.
2. Close the ballcock (2) and connect the hose of the high-pressure cleaner to the water outlet (2),,
then open the pure water outlet (2) again.
3. Remove the hoses and close all ballcocks for transport,
so that water cannot flow out of the unit.
Open the ballcocks to drain the water and depressurise the unit before transport.
5.3 Integrated TDS measuring unit
• Sturdy measuring device designed for industrial applications. Watertight, shielded cable.
• Displays the TDS input and output values from two probes.
• Auto-off feature for maximum battery life. Switches off after 30 seconds of inactivity.
(requires 2x AA batteries, max. service life of approx. 12-18 months)
• Dual-range 0-9990 ppm (resolution of 1 ppm from 0-999, resolution of 10 ppm from 1000-9990)
indicated by a flashing "x10" symbol.
• Factory-calibrated using a 342 ppm NaCl solution. Can be recalibrated using a small screwdriver.
Can be performed together or individually for each probe.
No warranty is provided in the case of incorrect handling or misadjustment of the unit.
5