background image

CLEANCUT ULTRA-LOW

 

INSTALLATION GUIDE 

COPYRIGHT © 2020 SAFEWAY SAFETY STEP, LLC 

(DBA “CleanCut”) All Rights Reserved 

Reproduction or Distribution of this Installation Manual is Strictly Prohibited 

Summary of Contents for ULTRA-LOW

Page 1: ...CLEANCUT ULTRA LOW INSTALLATION GUIDE COPYRIGHT 2020 SAFEWAY SAFETY STEP LLC DBA CleanCut All Rights Reserved Reproduction or Distribution of this Installation Manual is Strictly Prohibited...

Page 2: ...E OCCURRED DURING INSTALLATION OR SUBSEQUENT USE OF THE CLEANCUT ULTRA LOW FAILURE TO FOLLOW THE INSTRUCTIONS IN THIS INSTALLATION MANUAL SHALL VOID ANY WARRANTY GIVEN WITH RESPECT TO THE CLEANCUT ULT...

Page 3: ...allation kit the following tools and materials are recommended to have on hand for installation Additional Tools Materials Butane Torch Cardstock Paper Caulking Gun Chisels Deburring Tool i e drywall...

Page 4: ...nsiderations for cutting cast iron tubs in the following section 4 Confirm that the CleanCut Ultra Low will fit the bathtub First measure the top rail width measurement as well as the width measuremen...

Page 5: ...gs with fitting the CleanCut Ultra Low and reduces risk of injury 5 After the cut out section of the tub has been removed take a few moments to clean the area in and around the tub Using a dustpan and...

Page 6: ...side of the tub Mark this tracing Right 3 Cut out the paper templates with scissors making sure to keep to the inside of the tracings Figure 2 FIGURE 2 4 It is time to transfer the shape of our cut t...

Page 7: ...Ultra Low The inside of the tub may be irregular in shape so measurements for the inside line must be made every 3 from one end of the CleanCut Ultra Low to the other Once completed use your yard sti...

Page 8: ...the vertical ends of the CleanCut Ultra Low Remember to tilt your blade on each corner cutting all areas that have been marked 8 Place the CleanCut Ultra Low into position Remember the face with the...

Page 9: ...he conditions present during your installation For example for wooden sub floors begin by screwing or adhering with included adhesive a treated 2x4 directly to the sub floor to serve as a base for the...

Page 10: ...hieved Secure both sides of the support structure by placing two screws in each side Figure 8 7 Apply adhesive to the tops of the 2x4 s that are already in place in the channel if they are needed for...

Page 11: ...th the beads one time only as the adhesive becomes tacky to the touch quickly 4 Underneath the bottom edges of the CleanCut Ultra Low are a bit more difficult to see and the included angled nozzle sho...

Reviews: