STEP 1
The bath must be placed and installed onto a perfectly level floor
surface. Make sure a recess is prepared in the floor as shown below.
Top View
Recess in floor
Level floor surface
Side View
Level floor surface
Installation Recommendation
It is recommended to place rubber mats on the floor where the bath will
be installed to prevent the bath from slipping.
STEP 2
Carefully remove the top wooden board of the
crate.
Drainage
Recess in floor
Rubber mat
(Optional)
Drainage
3
Marbleform Bath - Installation V2_10/18