6
BEFORE INSTALLATION
I.
Inspection of the shipment, examine pressure/vacuum manway for any shipping damage.
II.
Examine the spring assembly on the manway, springs, spring rods and spring retainer for damage.
Page 1: ...The C B model 1700 24 PV manway is not a static tank appurtenance but is an integral part of the dynamic operation of the tank Just as other pertinent equipment to your process such as blowers pumps...
Page 2: ...ending on the rate of buildup or severity of the conditions GENERAL INSPECTION PROCEDURE CAUTION Pressure or vacuum conditions in the tank must be relieved and must be in a non operating state before...
Page 3: ...ere should be only minimal movement and no rocking should be evident 2 Lift cover 2 and taking care when laying it back on the tank roof to not damage the support rods for the rain hood Inspect the co...
Page 4: ...aterial that has coated any surface in the pressure vacuum disc area should be removed and clean immediately If this area is not kept clean and clear of material may cause the pressure vacuum area may...
Page 5: ...e vacuum disc 4 to spring retainer leg 9 must be equal for all the pressure springs inner springs 7 6 For the vacuum spring 4 outer springs 8 measure from the vacuum disc 4 to the spring retainer leg...
Page 6: ...BEFORE INSTALLATION I Inspection of the shipment examine pressure vacuum manway for any shipping damage II Examine the spring assembly on the manway springs spring rods and spring retainer for damage...
Page 7: ...7...