Clay Oven SHAHI TANDOOR Manual Download Page 4

 

Installation Instructions 

 
This product is made with the safest materials conforming to the United States NSF 
and  according  to  the  relevant  CE  directives.  Proper  installation  must  conform  to  all 
local  codes  and  with  US  Fuel  GAS  Code,  ANSI  Z223.1-1988  or  its  latest  edition. 
Within  Europe,  appliances  should  be  in  installed  in  accordance  with  BS  6173:1982 
code  of  practice  for  installation  of  gas  catering  appliances,  taking  into  account  Gas 
Safety  Regulations  1984  as  amended  by  the  Gas  Safety  (Installation  and  Use) 
(Amendment) Regulations 1990, 1996 and Health and Safety at Work Act 1974. 
 
Installation of this equipment must be performed by a registered gas-safe gas fitter. 
 
 
The  appliance  must  be  isolated  from  the  gas  supply  piping  system  by  closing  its 
individual manual shutoff valve during any pressure testing of the gas supply piping 
system  at  test  pressures  equal  to  or  less  than 

½

  psi  (3.5  kPa).  In  Europe  a  gas 

soundness test must be carried out. 
 
 

Unpacking

 

 

 

Un-crate the unit with extreme care, do not use a hammer or heavy tools to 
un-crate the unit, always use outward prying. 

 

Make sure the unit is in the upright position before starting to un-crate. 

 

Before  fixing  the  appliance  in  place,  remove  all  protective  plastic 
coating from the unit. 

 

Oven  is  on  4”(100mm)  wheel  castors  and  can  be  rolled  out  easily  to  the 
designated installation area. 

 

Unit must be rolled around by hand. Do not use a lift jack.  

 
 

Clearance and Positioning 
 

 

Do not install propane (LPG) appliances below ground level. 

 

This  appliance  requires  a  6”(150mm)  clearance  from  combustible  and  non-
combustible materials. 

 

 

A clear space of at least 6”(150mm)should be left at the rear and sides of the 
appliance.  

 

There must be a minimum clearance of 32” in the US and (750mm in Europe) 
between top of the appliance and any overhanging shelf. Shelves must be of a 
non-combustible material.  

 

It is recommended that the appliance is not installed in draughty locations or 
near doors.  

 

If the appliance is positioned on a combustible floor, sheet metal (preferably 
stainless steel) equal to the base area of the appliance must be secured to the 
floor prior to fixing the appliance in place.  

 

Ensure that the appliance is level. 

 
 
 

 
 
 

Summary of Contents for SHAHI TANDOOR

Page 1: ...n Company Ltd Leading manufacturers of clay ovens since 1974 163 Dukes Road London UK W3 0SL www clayovens com Tel 44 208 896 2696 Fax 44 208 8962686 CONFORMS TO ANS Z83 11b 2006 CONFORMS TO ANSI NSF...

Page 2: ...ation Instructions 4 6 Unpacking Clearance positioning Ventilation Gas supply connection Start up operation User instructions First firing Shutdown Maintenance cleaning 7 Component replacement 8 Spare...

Page 3: ...talled in accordance with current local regulations and only used in a well ventilated area For Your Safety Please post in a prominent location instructions to be followed in the event the user smells...

Page 4: ...extreme care do not use a hammer or heavy tools to un crate the unit always use outward prying Make sure the unit is in the upright position before starting to un crate Before fixing the appliance in...

Page 5: ...xed pipe work must not be used with this appliance Installation shall be made with a connector that complies with the Standard for Connectors for Movable Gas Appliances ANSI Z21 69 CSA6 16 and a quick...

Page 6: ...hen not in use the control knob should always be left in the OFF position see diagram below FIRST FIRING It is important to gradually build up heat within the Tandoor the first time its being used The...

Page 7: ...nt To safely remove the build up of grease on the clay surface wipe it down with a cloth that has been dampened with a solution of salt and white vinegar Servicing Gas catering equipment should be rou...

Page 8: ...e the igniter lead from piezo 2 Undo the nut holding the pilot light assembly cradle and withdraw 3 Replace the electrode 4 Replace as above in reverse order Pilot Burner 1 Loosen the thermocouple and...

Page 9: ...uple T 020 Igniter Electrode T 030 Pilot Light Injector NAT T 035 Pilot Light Injector LPG T 040 Gas valve T 050 Injector NAT T 060 Injector LPG T 070 Ignition Cable T 080 Piezo Igniter T 090 Burner T...

Page 10: ...BSP For size 1 and size 2 Natural Gas Propane Gas LPG Heat Input 10kW net 33 000 Btu 10 kW net Gas Pressure 20 mbar 37mbar Burner Pressure High rate 15 16mbar 35 36mbar Low rate 6 7mbar 26 27mbar Gas...

Page 11: ...ing the burner by using non combustible material eg aluminium foil b Remove obstruction and clean the sensor point gently c Undo pilot light connection and blow out obstruction 7 What do I do if the p...

Reviews: