Swing arm and extension arm installation
Bending arm type:
1.
fi x the swing arm to carriage through hinge, and the extension arm insert the swing arm’s tube
pipe ,and then fasten with screw.
2.
Teeth block installation: teeth block can protect the swing arm is not move, safety and reliable
Straight arm type:
1.
Install the swing arm on the carriage and then use the pin fi x it (picture 20)
2.
Then install the middle extension in the swing arm and then install the screw to prevent sliding
out
3.
As well, install end extension in the middle extension and use screw fi x it
Notice: Select suitable steel shim as gasket and insert under the post bottom, to make
the post vertical. The thickness of steel shim should less than 5 mm.
1.
Connect the oil pipe and cable through the oil pipe slot.
2.
Fix the hydraulic station, then connect the oil pipe fi ttings and wire plug.
Image 7
Image 8
Summary of Contents for PE 2011T
Page 4: ...PE 2011T PONT ELEVATEUR 2 COLONNES 400V 6T PASSAGE HAUT 4480mm 2 6Kw 4 Image 2...
Page 17: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 17 Image 2...
Page 27: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 27 Circuit drawing Picture 15...
Page 28: ...PE 2011T 2 COLUMNS POST LIFT 400V 6T HIGH PASSAGE 4480mm 2 6Kw 28...
Page 29: ......
Page 30: ......
Page 31: ......