6
English
Bleeding
Before using the jack for the first time it should be bled to eliminate any air which might have
entered the hydraulic system during the journey from the factory. Air in the hydraulic system could
negatively affect the lifting performance of the jack. Procedure:
1. Open the release valve by turning
it anticlockwise two full turns with
the jack handle.
2. Insert the handle into the handle socket and
twist it to lock it in place.
3. Hold the lifting arm (4) down and pump
the handle 5–10 times.
4. Close the release valve fully by turning it
clockwise with the jack handle.
Checking the operation of the jack
1. Close the release valve fully by turning it clockwise with the jack handle.
2. Pump the lifting arm up to the maximum height.
3. Open the release valve by turning it anticlockwise and lower the lifting arm completely.
4. Do not use the jack if it operates in any way abnormally, contact the place of purchase if you
are unsure.