Page 8
05_62699_0A
7. Door pAnel AnD bAcK pAnel instAllAtion
A.
(
1
) Hold end panel at the top center with white inner surface facing inside of the shelter. (
2
) Wrap the edges
of the fabric panel around the end rib and line up the cross rails with the pre made slits in the fabric.
A1
A2
C.
(
1
) Disconnect side cross rail from the end rib. Leave the Shelter Stabiliser attached to the rib with the bolt.
(
2
) Pull the end panel over the end rib and bring the end of the cross rail through the cut slit in the panel.
(
3
) Reattach the side cross rail to the end rib.
c1
c2
c3
b1
b2
b3
B.
(
1
) Disconnect top cross rail (the horizontal pipe that runs from front to back along the top) from the end rib.
(
2
) Pull the end panel over the end rib and bring the end of the cross rail through the cut slit in the panel.
(
3
) Reattach the top cross rail to the end rib.