8. Recommended Commissioning Procedure 

 

1.  If the vessel does not contain any process fluid, move the top then bottom valve to the run position. 

As long as liquid slowly fills the gage, the ballcheck will not engage. If there is concern over the rate 

at which fluid will enter the gage, then follow the remaining steps in this procedure. 

2.  When there is already liquid present in the vessel open the top valve to the bypass position. It is best 

practice when commissioning any level gage to open the top valve first. This allows the pressure of 

the vessel to equalize with the gage. 

3.  Open the bottom valve to the bypass position. This will allow liquid to flow from the vessel through 

the valve and into the gage.  Note: While the valve is in bypass mode the ballcheck cannot seat.  

4.  Wait until the fluid stops rising.  

5.  Operate the handle on the top valve and move the arrow to the run position.  

6.  Operate the handle on the bottom valve  and move the arrow  to the run position. The gage  is now 

ready for normal operation. In the event of a catastrophic failure the ballchecks will seat isolating the 

gage from service. 

 

Visit 

http://www.Jerguson.com/360-series

 for a video demonstration of the proper procedure for 

commissioning a glass level gage equipped with the 360 series safety ballcheck valves. 

9. Maintenance 

Rebuild Kit Exploded

 

View (Part# S25189)

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Jerguson 360 Series

Page 1: ...ay Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Installation Operation Maintenance Instructions IOM J500 36 2017 10 360 Series Safety...

Page 2: ...440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com Table of Contents 1 INTRODUCTION 3 2 WARRANTY 3 3 ABOUT THIS MANUAL 3 4 INSPECTION AND DELIVERY 3 5 PRODUCT DESCRIPTION 3 6 S...

Page 3: ...all instructions before attempting to install operate or maintain this equipment Only persons certified to perform work described herein should attempt any actions suggested Safety precautions and com...

Page 4: ...IOM J500 36 Jerguson 360 Series 2017 10 4 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com 6 Specifications...

Page 5: ...ess connection the valve is in the Bypass Position The Bypass Position is intended for use while the gage is being commissioned when there is already liquid present in the vessel This mode of operatio...

Page 6: ...to open the top valve first This allows the pressure of the vessel to equalize with the gage 3 Open the bottom valve to the bypass position This will allow liquid to flow from the vessel through the...

Page 7: ...orn nut lock washer and spacer Secure valve into a vice with the large compression nut facing upward Take care not to damage any of the external components Remove anti rotation pin and discard Use lar...

Page 8: ...he ball mechanism by sliding it off of the stem through the process opening 5 If you wish to replace or remove the internal ballcheck remove the ball retainer clip If not continue to step 6 6 Remove u...

Page 9: ...hrust washer on stem flange Align side with chamfer on ID with face of stem flange Angle the stem and insert into valve body 2 Holding stem flange and washer pressed up against top of body install 3 n...

Page 10: ...Torque nuts in X pattern to 15 20 in lb Visually confirm gland follower is level 4 Install Handle Back onto valve and cycle the stem several times Leave valve handle in the closed position 5 Replace...

Page 11: ...ke shown Place the new upstream seat and seal into the inlet gland opening 8 Insert the inlet gland assembly from the previous step into the valve as shown 9 Secure valve into a vice with the large co...

Page 12: ...IOM J500 36 Jerguson 360 Series 2017 10 12 16633 Foltz Parkway Strongsville OH 44149 USA Telephone 1 440 572 1500 Fax 1 440 238 8828 www Jerguson com sales clark reliance com...

Reviews: