5. INSTALLATION AND WIRING
VT1010E
25
6. Plug in the power harness into the overhead monitor system in the following order:
ground wire, battery wire, ACC wire and door wire.
Note:
The red lead must be connected to the ACC or IGN wire to the ignition switch. If you do
not connect this wire properly, the battery will drain / discharge prematurely.
Install the monitor
1. Carefully hold the overhead monitor up to the metal mounting plate.
2. Screw in the four CM4 x 8 screws making sure the wires are not in the way.
Mounting the player
3. Reconnect the battery.
4. Check the car’s brake lights, blinkers, wiper, etc. to ensure they are working properly.