`
`
1. SECURELY SNUG ALL FASTNERS
(DO NOT OVER TIGHTEN)
2. FOOT PEDAL SHOULD FREELY MOVE AFTER BEING SNUGGED
FINAL ASSEMBLY
STEP-1
STEP-2
STEP-1
BOTTOM VIEW
MARK HOLE LOCATIONS AS SHOWN AND DRILL
TWO 1/8 DIAMETER HOLES. SOME UNITS MAY
HAVE BEEN PRE-DRILLED ALREADY.
12-13/16”
2-1/8”
BOTTOM HOLE LOCATION THIS SIDE OF LEVER ASSEMLBY
SIDE VIEW AND PARTS SHOWN TO
CLARIFY HOLE LOCATIONS.
INSTRUCTIONS FOR TRAILERS
WITH
PRE-DRILLED SIDE HOLE
INSTRUCTIONS FOR LG10 AND LG900 TRAILERS
WITHOUT
PRE-DRILLED SIDE HOLE