background image

 

 

To  “

set”

  the  tent,  grasp  the  tent  material  at  the  rear  of  the  shelter  and  pull  it  downward.  Observe  the 

porch area  of  the  tent  lifting  accordingly  as  you  pull.  When  the  U-Channel  molding  is correctly  installed, 

the porch hoop pole will lightly touch the floor. 
 

To  achieve  this  condition,  start  by  finding  the  center  of  the  molding.    From  behind  the  unit,  pull  the 

midpoint  of  the  tent  downward  and  fold  the  tent  material  under  the  base  lip.  Press  the  midpoint  of  the 

molding  over  the  tent  material and base lip. Continue  pressing outward in  both directions until you have 

secured about twelve inches of molding onto the base.  
 

Having temporarily secured the tent to the base, take a walk around the unit.  Readjust the molding until 

you  have  verified  the  proper  porch  hoop  pole  position  and  also  that  the  tent  sides  and  corners  are 

properly proportioned.  

 

When satisfied, continue applying the molding around the shelter, one direction from center and then the 

other, pulling the material as you go so that surface is relatively wrinkle-free and snug. Use a side cutters 

to trim the ends of the molding if they are not equal relative to base. 

 
Reinstall  the  rear  adjustable  spreader  pole  to  tighten  the  fit  of  the  tent.    If  everything  still  looks  good, 

secure the molding with the #6 phillips screws.  Evenly space them about every ten to twelve inches, and 

also  put a  screw  in  the  center  of  both corners.    Since  there  aren’

t  any  predrilled  holes,  it's  advisable  to 

use a powered driver for this operation. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

-   T i p s   f o r   U s e   -  

IMPORTANT:

  Trim the edge 

of the molding so it ends 
approximately 6 inches behind 
the centerline seam on both sides 
of the shelter. 

6” 

6” 

Reviews: