Maintenance
52
Touch the NEXT button until you reach the screen that lets you activate the guid-
ed procedures to: change the date and time, replace the Resin bed and change
the desiccant.
10.2.
Maintenance icon
The following icon shows that the generator needs to be subjected to scheduled
maintenance;
clicking on it takes you to the maintenance list;
selecting active maintenance, when replacing the Resin bed and the desiccant,
automatically opens the guided procedure
(par. 10.6. Changing desiccant and
par. 9.7. Resin bed replacement).
For pump maintenance, please contact technical assistance
(par. 2.5. Technical
Assistance).