Issued: April 2021
9
Reconnect hoses to the bottle refill
nozzles.
Place the Top Panel back use all 8 x
m6 screws
then put the Bottom Panels back on
HYDROBANK ASSEMBLY INSTRUCTIONS
CIVIQ.DOC-14-01-2021-V2
As an option place drain strainer*
10
*optional
HYDROBANK ASSEMBLY INSTRUCTIONS
CIVIQ.DOC-14-01-2021-V2
Reconnect hoses to the bottle refill
nozzles.
Place the Top Panel back use all 8 x
m6 screws
then put the Bottom Panels back on
As an option place drain strainer*
*Optional
Step 10.
Step 9.
OPERATION OF QUICK CONNECT FITTINGS
SIMPLY PUSH IN
TUBE TO ATTACH
TUBE IS SECURED
IN POSITION
PUSH IN COLLET
TO RELEASE TUBE
PSUHING TUBE IN BEFORE
PULLING IT OUT HELPS TO
RELEASE TUBE