6
4. OPERATING INSTRUCTIONS
4.1.
FIRST STEPS
In order to achieve an optimum operation of the machine, please follow the below-mentioned steps
carefully.
-
After unpacking and positioning the machine on a level surface, remove the front cover by
unscrewing the 2 fastening screws shown in Fig. 1. Lift the front cover out of its anchoring to
expose the pressing system.
Fig. 1
-
Attach the supply tunnel by mounting it onto the support plate and secure the fixation lever (see
Fig. 2).
Fig. 2