© 1999-2017 Citrix Systems, Inc. All rights reserved.
p.10
https://docs.citrix.com
Plan
Jul 15, 2013
Before you install your new MPX appliance, carefully unpack the appliance and make sure that you received all of the parts
according to the appliance you ordered. Next, verify that the location where you will install the appliance meets
temperature and power requirements. Also, verify that the server cabinet or floor-to-ceiling cabinet is securely bolted to the
floor and has sufficient airflow.
Only trained and qualified personnel should install, maintain, or replace the appliance and should be sure to follow all
cautions and warnings.