Page 10
General Installation (All Dryers)
Position dryer for the least amount of exhaust piping and elbows,
and allow free access to the rear of dryer for future servicing of
belts, pulleys and motors. Installation clearance from all
combustable material for gas dryers is 24 ceiling clearance, 24
rear clearance, and 0 side clearance. Installation clearance from
all combustable material for steam dryers is 24 ceiling clearance,
24 rear clearance, and 0 side clearance.
Before operating dryer, open basket door and remove blocking
between front panel and basket. Read the instruction tags, owner's
manual, warnings, etc.
The dryer is so designed that when an operator opens the dryer
door, the basket and exhaust fan stop. Hot, dry air is properly and
effectively moved through the basket and exhausted through a lint
trap to the venting and eventually to the atmosphere. The lint
accumulates in the collector and should be removed as needed,
minimum once daily.
IMPORTANT
Provide adequate clearance for air openings into the combustion
chamber.
Replacement parts for this dryer are available from your distributor
or by contacting the factory at the address or phone number printed
on the cover of this manual.
WARNING Unit is heavy!
NOTE
The gas installation must conform with local codes or, in the
absence of local codes, with the
National Fuel Gas Code, ANSI
Z223.1
or the
CAN/CGA-B149, Installation Codes.
GENERAL
INSTALLATION
(ALL DRYERS)
GENERAL
IMPORTANT
REPLACEMENT PARTS
Summary of Contents for HD175
Page 20: ...Page 20 Gas Piping Installation Illustration...
Page 24: ...Page 24 Dryer Installation with Multiple Exhaust Illustration...
Page 38: ...Page 38 Two Timer Models Figures 1 2 and 3 Illustrations...
Page 45: ...Page 45 Shimming the Basket and Spider Assembly Illustration...
Page 50: ...Page 50 175 LB LAUNDRY DRYER REAR EXPLODED VIEW...