
3-8
Cisco UCS C250 Server Installation and Service Guide
OL-20888-02
Chapter 3 Maintaining the Server
Preparing for Component Installation
Preparing for Component Installation
This section describes how to prepare the server for component installation and includes the following
topics:
•
Required Equipment, page 3-8
•
Shutting Down and Powering Off the Server, page 3-9
•
Removing and Replacing the Server Top Cover, page 3-10
•
Replaceable Component Locations, page 3-11
Warning
Only trained and qualified personnel must be allowed to install, replace, or service this equipment.
Statement 1030
Warning
This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the
two power supply cords before servicing the unit.
Statement 14
Required Equipment
The following items are used to perform the procedures in this chapter:
•
Number 2 Phillips-head screwdriver
•
Number 1 Phillips-head screwdriver
•
Needle-nose pliers
•
Electrostatic discharge (ESD) strap or other grounding equipment such as a grounded mat.
Summary of Contents for UCS C250
Page 6: ...Contents vi Cisco UCS C250 Server Installation and Service Guide OL 20888 02 ...
Page 12: ...xii Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Preface ...
Page 14: ...xiv Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Preface ...
Page 18: ...1 4 Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Chapter 1 Overview ...