Chapter 5 Turn Up Network
NTP-A40 Provision BLSR Nodes
NTP-A40 Provision BLSR Nodes
Step 1
Complete the
“DLP-A44 Install Fiber-Optic Cables for BLSR Configurations” task on page 17-52
verifying that the following rules are observed:
•
Verify that the east port at one node is connected to the west port on an adjacent node, and this
east-to-west port connection is used at all BLSR nodes, similar to
. In the figure, the
OC-N drop card on the left side of the shelf is the west port, and the drop card on the right side of
the shelf is considered the east port.
Figure 5-2
Four-Node, Two-Fiber BLSR Fiber Connection Example
•
For four-fiber BLSRs, verify that the same east port to west port connection is used for the working
and protect fibers, similar to
. Verify that the working and protect card connections are
not mixed. The working cards are the cards where you will provision the DCC terminations.
Purpose
This procedure provisions ONS 15454 nodes for a BLSR.
Tools/Equipment
None
Prerequisite Procedures
NTP-A35 Verify Node Turn-Up, page 5-2
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Provisioning and higher
55297
Node 1
West
East
West
East
West
East
West
East
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 4
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 2
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 3
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...