DLP-A44 Install Fiber-Optic Cables for BLSR Configurations
Figure 17-22
Connecting Fiber to a Six-Node Integrated Path Protection Dual-Ring Interconnect
Step 4
Return to your originating procedure (NTP).
DLP-A44 Install Fiber-Optic Cables for BLSR Configurations
Purpose
This task installs the fiber-optics to the east and west bidirectional line
switched ring (BLSR) ports at each node. See
to provision and test BLSR configurations.
Tools/Equipment
Fiber-optic cables
Prerequisite Procedures
NTP-A112 Clean Fiber Connectors, page 15-13
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Node 1
Node 3
Node 2
Node 4
Slot
5
Slot
12
Tx
Rx
Slot
5
Slot
12
Tx
Rx
Slot
6
Slot
13
Slot
5
Slot
12
Tx
Rx
Slot
5
Slot
12
Tx
Rx
Slot
6
Slot
13
Node 5
Node 6
Slot
5
Slot
12
Tx
Rx
Slot
5
Slot
12
Tx
Rx
83500
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...