C H A P T E R
3
Prepare for Installation
Before you install the Cisco NCS 540, you must prepare your site for the installation.
Preparing your site involves these tasks:
•
General Precautions, on page 13
•
Site Planning Checklist, on page 14
•
Site Power Guidelines, on page 14
•
Site Cabling Guidelines, on page 15
•
Tools and Equipment, on page 16
•
Prepare Your Location , on page 17
•
•
Prepare Rack for Router Installation, on page 18
•
Unpack the Cisco NCS 540 Router, on page 19
General Precautions
Observe the following general precautions when using and working with your chassis:
• Keep your system components away from radiators and heat sources, and do not block cooling vents.
• Do not spill food or liquids on your system components, and never operate the product in a wet
environment.
• Do not push any objects into the openings of your system components. Doing so can cause fire or electric
shock by shorting out interior components.
• Position system cables and power supply cable carefully. Route system cables and the power supply
cable and plug so that they are not stepped on or tripped over. Ensure that nothing is rests on your system
component cables or power cable.
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
modifications. Always follow your local and national wiring rules.
• If you turn off your system to avoid damage of system components, wait at least 30 seconds before
turning it on again.
Cisco NCS 540 Router Hardware Installation Guide
13