C H A P T E R 3
Preparing to Install the Switch
Unpacking and Inspecting the Switch
Installing the Chassis in a Four-Post Rack
Attaching the Bottom-Support Rails to the Rack
Attaching Front-Mount Brackets to the Chassis
Installing the Chassis in a Four-Post Rack
C H A P T E R 4
Connecting the Switch to the ACI Fabric
Preparing to Connect to Other Devices
Connecting a Leaf Switch to an APIC
Connecting a Leaf Switch to a Spine Switch
Setting Up an Optional Console or Optional Out-Of-Band Management Interface
Maintaining Transceivers and Optical Cables
C H A P T E R 5
Replacing a Fan Module During Operations
Replacing a Power Supply Module
Removing an HVAC/HVDC Power Supply
Installing an HVAC/HVDC Power Supply
Wiring a 48 V DC Electrical Connector Block
A P P E N D I X A
General Requirements for Cabinets and Racks
Requirements Specific to Standard Open Racks
Cisco Nexus 9336PQ ACI-Mode Switch Hardware Installation Guide
iv
Contents